[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fCLCm-QJQQ1oLLNkzTYG-C0MQ1VQ_7b7sM_yL24Rf7OY":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":16,"related":17,"source":27,"type":28},[],"2023-10-21 10:03:43",100671432,[8,9,10,11],"基于BIM施工模型进行成本控制,有效提高成本管控能力","交付工程总承包BIM竣工模型","应用BIM运营维护模型,实现基于BIM的运营维护管理","基于BIM施工模型对项目进度进行集成化管理,解决施工和资源配置的冲突和矛盾,确保工期目标实现",{"courseId":13,"courseImg":14,"courseName":15},"4353fccaa1904837fa0a802f5516e296","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F5c1fca3e2880e97847a28116821a0b78.png","BIM工程应用","以下选项不是工程总承包企业BIM应用工作重点的是( )",[18,29,38,47,57,67,77,87,96,106],{"answer":19,"createTime":20,"id":21,"options":22,"question":26,"source":27,"type":28},[],"2023-10-20 21:57:54",100671314,[23,24,25],"Premiere","Revit MEP","ArchiCAD","下列不是应用于建筑对象建模的是( )","v1",0,{"answer":30,"createTime":5,"id":31,"options":32,"question":37,"source":27,"type":28},[],100671316,[33,34,35,36],"Rhino","ARCHICAD","PKPM","Revit","下列属于参数化复杂曲面专用设计工具的是( )",{"answer":39,"createTime":5,"id":40,"options":41,"question":46,"source":27,"type":28},[],100671318,[42,43,44,45],"在项目的不同阶段,不同利益相关方通过在 BIM 中插入、提取信息,但是不能修改信息","BIM 包含相关设施的信息,只能为该设施从设计到施工过程的决策提供可靠依据的过程","BIM 是一个设施(建设项目)物理和功能特性的数字表达","BIM 是一个建筑模型物理和功能特性的数字表达","依据美国国家BIM 标准(NBIMS),以下关于 BIM 的说法,正确的是( )",{"answer":48,"createTime":49,"id":50,"options":51,"question":56,"source":27,"type":28},[],"2023-10-21 10:03:39",100671319,[52,53,54,55],"LOD 100 等同于概念设计","LOD分为五个等级","LOD 400 等同于方案设计或扩展设计","LOD的定义可以用于两种途径:确定模型阶段输出成果以及分配建模任务","关于LOD建模深度标准下列说法错误的是( )",{"answer":58,"createTime":59,"id":60,"options":61,"question":66,"source":27,"type":28},[],"2023-10-20 21:57:49",100671320,[62,63,64,65],"成本核算","总体规划","碰撞检测","模型创建","BIM技术在方案策划阶段的应用内容不包括( )",{"answer":68,"createTime":69,"id":70,"options":71,"question":76,"source":27,"type":28},[],"2023-10-21 10:03:42",100671322,[72,73,74,75],"建筑信息模型应用统一标准","专业P-BIM软件功能与信息交换标准","建筑工程设计信息模型分类和编码标准","建筑工程设计信息模型交付标准","以下不属于我国BIM模型的国家标准的是( )",{"answer":78,"createTime":79,"id":80,"options":81,"question":86,"source":27,"type":28},[],"2023-10-19 16:28:02",100671323,[82,83,84,85],"预制加工向概念设计","建筑向模型","二维向三维","规划设计向概念升级","BIM实现从传统( )的转换,使建筑信息更加全面、直观地表现出来",{"answer":88,"createTime":79,"id":89,"options":90,"question":95,"source":27,"type":28},[],100671324,[91,92,93,94],"按朝向命名","按方向命名","按轴线命名","按主次命名","房屋有多个立面,命名方式也有很多,以下哪种命名方式是不正确的( )",{"answer":97,"createTime":98,"id":99,"options":100,"question":105,"source":27,"type":28},[],"2023-10-21 10:03:38",100671325,[101,102,103,104],"使用材质提取功能,分别统计,导出到 Excel 中进行汇总","使用材质提取功能,设置材质所在族类别","使用明细表功能,将材质设置为关键字","使用材质提取功能,设置多类别材质统计","如何统计出项目中不同对象使用的材料数量,并且将其统计在一张统计表中:( )",{"answer":107,"createTime":108,"id":109,"options":110,"question":113,"source":27,"type":28},[],"2023-10-20 21:57:53",100671326,[35,111,36,112],"Bentley","Archicad","以下不属于BIM核心建模软件的是( )"]