[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fGOklo7jqr8tVULmQvu17nNkINpGx4J6hJ7KGOWfhS8M":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":13,"question":17,"related":18,"source":29,"type":112},[],"2023-10-27 20:29:41",101997816,[8,9,10,11,12],"租约区间","物业管理情况","租金情况","建筑面积","租户名称",{"courseId":14,"courseImg":15,"courseName":16},"260af7874ac0ca98c9e7b8646c5bb503","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002Fd761cc928ccca82a5c885864294007f8.jpg","23毕业设计大赛+数字创新大赛","下列选项中,属于BIM技术业主用以实施对租户信息的调整和更新的数据包括()",[19,31,40,49,58,67,76,85,94,103],{"answer":20,"createTime":21,"id":22,"options":23,"question":28,"source":29,"type":30},[],"2023-10-27 20:29:40",101997738,[24,25,26,27],"先选择BIM应用技术路线,然后确定BIM应用具体内容,最后制定BIM应用业务目标","先确定BIM应用具体内容,然后制定BIM应用业务目标,最后选择BIM应用技术路线","先制定BIM应用业务目标,然后确定BIM应用具体内容,最后选择BIM应用技术路线","先选择BIM应用技术路线,然后制定BIM应用业务目标,最后确定BIM应用具体内容","下列选项中关于BIM实施规划流程正确的是( ).P122","v1",0,{"answer":32,"createTime":21,"id":33,"options":34,"question":39,"source":29,"type":30},[],101997740,[35,36,37,38],"立面图","剖面图","平面图","详图","把需要详细表达的建筑局部用较大比例画出,称为建筑( )P102",{"answer":41,"createTime":21,"id":42,"options":43,"question":48,"source":29,"type":30},[],101997742,[44,45,46,47],"施工主导管理模式","设计主导管理模式","咨询辅助管理模式","业主自主管理模式","下列BIM应用管理模式中更适用于工程总承包项目的是( )( )",{"answer":50,"createTime":21,"id":51,"options":52,"question":57,"source":29,"type":30},[],101997748,[53,54,55,56],"详细设计","机械设计","再次设计","施工图设计","建筑工程设计文件一般分为初步设计和( ).P94",{"answer":59,"createTime":21,"id":60,"options":61,"question":66,"source":29,"type":30},[],101997752,[62,63,64,65],"应碰撞检查","软碰撞检查","综合碰撞检查","专项碰撞检查","基于BIM技术的碰撞检查应用中的缺陷检测是属于( )P71",{"answer":68,"createTime":21,"id":69,"options":70,"question":75,"source":29,"type":30},[],101997755,[71,72,73,74],"5D","3D","4","6D","BIM不仅可实现三维可视化,它还是一个()关联数据库",{"answer":77,"createTime":21,"id":78,"options":79,"question":84,"source":29,"type":30},[],101997758,[80,81,82,83],"将风口插入点的偏移量设置为风管底部高度即可","先布置风口,然后用&quot;对齐&quot;功能使其与风管侧壁平齐","布置风口的时候开启&quot;风道末端安装到风管上&quot;","先布置风口,绘制风管时开启&quot;自动连接&quot;即可","关于&quot;将风口直接连接至风管侧壁&quot;的操作,下面哪项描述是正确的?()",{"answer":86,"createTime":21,"id":87,"options":88,"question":93,"source":29,"type":30},[],101997762,[89,90,91,92],"几何信息主要包括对建筑或构件自身形状、空间位置及空间相互约束关系的描述","信息粒度表示模型包含的信息的全面性、细致程度及准确性的指标","全生命周期(Life-Cycle)指的是建筑物从计划建设到使用过程终止所经历的所有阶段的总称","非几何信息指的是建筑物及构件除几何信息以外的其他信息,如材料信息、价格信息及各种专业参数信息等","下列选项关于《建筑工程设计信息模型交付标准》中相关术语规定说法不正确的是()",{"answer":95,"createTime":21,"id":96,"options":97,"question":102,"source":29,"type":30},[],101997765,[98,99,100,101],"保留","黑白","彩色","反选","下列哪项不是链接CAD界面后可选择的颜色显示方式?()",{"answer":104,"createTime":21,"id":105,"options":106,"question":111,"source":29,"type":30},[],101997767,[107,108,109,110],"设计阶段","规划阶段","改造阶段","施工阶段","一般将建筑全生命周期划分为四个阶段,其中不包括( )",1]