[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fhV_CnGI3CdsncP-PaiNObUlgmJmIYplwYWLkg8M68QY":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":16,"related":17,"source":27,"type":28},[],"2023-11-09 01:42:23",104568880,[8,9,10,11],"合同风险事件可能不发生","合同风险事件可以事先识别","合同风险常常是相对于某个承担者而言的","合同风险一经发生就会给业主或承包商带来损失",{"courseId":13,"courseImg":14,"courseName":15},"669a8fad491d5720655442f407c1167f","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002Fcd6aa804f56468e1fa7bc4a2057046b9.png","工程招标与合同管理","下列关于合同风险的特性,说法错误的是()",[18,29,38,47,56,65,74,83,92,95],{"answer":19,"createTime":5,"id":20,"options":21,"question":26,"source":27,"type":28},[],104568872,[22,23,24,25],"状态分析法","影响分析法","比例分析法","网络分析法","在分析干扰事件对整个工期的影响时,通过分析干扰事件发生前后的网络计划,对比两种工期计算结果,计算索赔值.这种分析方法称为()","v1",0,{"answer":30,"createTime":5,"id":31,"options":32,"question":37,"source":27,"type":28},[],104568873,[33,34,35,36],"短","长","一样","不确定","在FIDIC合同中,承包商对工程变更提出补偿要求的时间规定比提出索赔要求的时间()",{"answer":39,"createTime":5,"id":40,"options":41,"question":46,"source":27,"type":28},[],104568874,[42,43,44,45],"14","21","28","35","在FIDIC施工合同中,工程师指令暂停超过84天,承包商要求复工.在要求提出后()天工程师没有给出许可,承包商可将暂停所影响的工程部分作为删减项目,引起变更",{"answer":48,"createTime":5,"id":49,"options":50,"question":55,"source":27,"type":28},[],104568875,[51,52,53,54],"工序之间、工程小组之间应有交接制度","工程中所有涉及双方的工程活动都应有签收证据","工程过程中某些特殊情况仅需口头传达即可,不需要书面证明","在工程中,业主,承包商和工程师之间要保持经常联系","下列说法错误的是()",{"answer":57,"createTime":5,"id":58,"options":59,"question":64,"source":27,"type":28},[],104568876,[60,61,62,63],"①⑤⑥③②④","①⑤③⑥④②","⑤①③⑥②④","⑤③①⑥②④","除采取回避策略外,工程中针对风险的措施还有:①购买保险②通过合同谈判修改合同条件③采用联营承包或分包措施④通过索赔弥补风险损失⑤技术、经济和组织的措施⑥在报价中提高不可预见风险费,其一般优先次序为()",{"answer":66,"createTime":5,"id":67,"options":68,"question":73,"source":27,"type":28},[],104568877,[69,70,71,72],"不平衡报价","开口升级报价","规避风险报价","多方案报价","在总报价不变的情况下,适当调整分项工程单价,达到有利的结果.这种在报价中考虑风险的方法为()",{"answer":75,"createTime":5,"id":76,"options":77,"question":82,"source":27,"type":28},[],104568878,[78,79,80,81],"文明施工费","临时施工费","二次搬运费","施工机械使用费","在我国建筑安装工程费用构成中,属于直接工程费的是( )",{"answer":84,"createTime":5,"id":85,"options":86,"question":91,"source":27,"type":28},[],104568879,[87,88,89,90],"组织","时间","技术","价格","解决()上的协调,一个比较简单的手段是在一张横道图或网络图上标示出相关合同所定义的里程碑事件和他们的逻辑关系",{"answer":93,"createTime":5,"id":6,"options":94,"question":16,"source":27,"type":28},[],[8,9,10,11],{"answer":96,"createTime":5,"id":97,"options":98,"question":103,"source":27,"type":28},[],104568881,[99,100,101,102],"总价合同是总价优先","承包商承担了工程量和价格风险","工程中双方结算方式比较简单","在总价合同的执行中,承包商没有索赔机会","于总价合同,下列说法错误的是( )"]