[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fs-K9HVsDNEYF49MV7Pco-Pwrxj8TSdhOf8ZP894xkto":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":16,"related":17,"source":27,"type":28},[],"2023-12-16 17:34:02",114595192,[8,9,10,11],"3.0","3.3","3.6","4.0",{"courseId":13,"courseImg":14,"courseName":15},"a3b39537fa0a0fe249ae708aa306012f","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F0bd341e2e01e18d6226275c850434900.jpg","装配式混凝土结构施工技术","叠合板1:板下支撑间距大于( )时,板底跨中需设置竖向支撑",[18,29,38,47,56,65,74,83,86,95],{"answer":19,"createTime":5,"id":20,"options":21,"question":26,"source":27,"type":28},[],114595180,[22,23,24,25],"105","103","206","100","某基坑体积为 100m3,如土的最初可松性系数 Ks 为 1.05,最后可松性系数 Ks为 1.03,则开挖后松土体积为( )m3","v1",0,{"answer":30,"createTime":5,"id":31,"options":32,"question":37,"source":27,"type":28},[],114595182,[33,34,35,36],"乘积,最大值","之和,最小值","乘积,最小值","之和,最大值","进行土方调配时,可以拟定几个方案,以确定最优方案.确定最优方案的方法是比较各方案中个调配区土方量与运距( ),其总和为( )的方案即为最优方案",{"answer":39,"createTime":5,"id":40,"options":41,"question":46,"source":27,"type":28},[],114595183,[42,43,44,45],"20mm","30mm","40mm","50mm","在预制楼梯的安装时,为了给后续初装的抹灰层预留空间,楼梯侧面距结构墙体预留( )空隙",{"answer":48,"createTime":5,"id":49,"options":50,"question":55,"source":27,"type":28},[],114595184,[51,52,53,54],"建筑产业现代化的需求","解决建筑市场劳动力资源短缺及劳动力成本增加的需要","改变建筑设计模式和建造模式","建筑行业节能减排的需要","发展装配式建筑的最主要原因是",{"answer":57,"createTime":5,"id":58,"options":59,"question":64,"source":27,"type":28},[],114595186,[60,61,62,63],"作业半径的因素","运输路径","施工方法","施工空间","决定采用移动式的履带起重机还是固定式的塔式起重机的因素不包括( )",{"answer":66,"createTime":5,"id":67,"options":68,"question":73,"source":27,"type":28},[],114595189,[69,70,71,72],"拖拉机或拖板车","翻板机","转运架","振动台","场内水平运输设备不包括( )",{"answer":75,"createTime":5,"id":76,"options":77,"question":82,"source":27,"type":28},[],114595190,[78,79,80,81],"70","75","80","85","水泥的入机温度不高于()℃",{"answer":84,"createTime":5,"id":6,"options":85,"question":16,"source":27,"type":28},[],[8,9,10,11],{"answer":87,"createTime":5,"id":88,"options":89,"question":94,"source":27,"type":28},[],114595193,[90,91,92,93],"1","1.5","2","2.5","箱梁混凝土灌注时,布料机应保证布料准确、均匀,布料时严格控制混凝土自由降落高度不大于( ),尽量使混凝土先落在桥面斜板上再进入腹板,防止混凝土离析",{"answer":96,"createTime":5,"id":97,"options":98,"question":103,"source":27,"type":28},[],114595194,[99,100,101,102],"整体缺陷","一般缺陷","局部缺陷","严重缺陷","预制楼梯2-构件入场检验外观质量不应有( )"]