[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fJe9BspoVZWt09lp1iuIHVI3AGqGHTJPvfhLm1Hki7W0":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":19,"related":20,"source":30,"type":31},[],"2023-12-28 18:06:59",123324549,[8,9,10,11],"⑤③⑧②⑦①④⑥","③⑤⑧②⑦①④⑥","③⑤⑧⑦②①④⑥","⑧③⑤②⑦①④⑥",{"count":13,"courseId":14,"courseImg":15,"courseName":16,"workId":17,"workName":18},200,"b7d99f6083a9b9be4e3c2005c749be28","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002Fbd670c0bd5e25c46e70b6b0a65811715.jpg","水利工程施工技术","work_31936942","11:土石坝工程","混凝土面板堆石坝坝体结构主要包括:①主堆石区;②垫层区;③盖重区;④下游堆石区;⑤上游铺盖区;⑥下游护坡;⑦过渡区;⑧混凝土面板.在水平方向,从上游向下游方向,正确排列上述各坝体分区( )",[21,32,41,50,53,64,73,82,90,95],{"answer":22,"createTime":5,"id":23,"options":24,"question":29,"source":30,"type":31},[],123324539,[25,26,27,28],"30m&lt;H&lt;70m","30m&lt;H&lt;100m","30m&le;H&le;70m","30m&le;H&lt;100m","根据《碾压式土石坝设计规范》(DL\u002FT 5395-2007)的规定,按坝高划分,土石坝中坝的坝高范围是( )","v1",0,{"answer":33,"createTime":5,"id":34,"options":35,"question":40,"source":30,"type":31},[],123324543,[36,37,38,39],"设计需要量&lt;规划开采量&lt;可采储量","设计需要量&lt;可采储量&lt;规划开采量","规划开采量&lt;设计需要量&lt;可采储量","可采储量&lt;规划开采量&lt;设计需要量","对于水利水电建筑工程,在只规划一个料场的情况下,土石方设计需要量、规划开采量、可采储量之间的大小关系是( )",{"answer":42,"createTime":5,"id":43,"options":44,"question":49,"source":30,"type":31},[],123324547,[45,46,47,48],"30","40","50","60","混凝土骨料原岩的单轴饱和抗压强度宜大于混凝土设计强度的1.5~2.0倍,且应大于( )MPa",{"answer":51,"createTime":5,"id":6,"options":52,"question":19,"source":30,"type":31},[],[8,9,10,11],{"answer":54,"createTime":55,"id":56,"options":57,"question":62,"source":30,"type":63},[],"2023-12-30 12:20:23",124376850,[58,59,60,61],"孔隙率","最优含水率","压实度","相对密度","含砾和不含砾的黏性土的填筑标准应以( )作为设计控制指标",1,{"answer":65,"createTime":55,"id":66,"options":67,"question":72,"source":30,"type":63},[],124376855,[68,69,70,71],"碾压水泥砂浆固坡","喷乳化沥青固坡","喷混凝土固坡","现浇混凝土面板固坡","混凝土面板堆石坝垫层料坡面碾压完成后,应尽快进行坡面保护.常用的垫层料坡面保护形式有( )",{"answer":74,"createTime":55,"id":75,"options":76,"question":81,"source":30,"type":63},[],124376859,[77,78,79,80],"测试石料的密度、容重、抗压强度、软化系数等物理力学参数","测试压实机械的性能,选择适宜的压实设备","确定适宜、经济的碾压施工参数(铺料厚度、碾压遍数、洒水率、行走速率等)","研究和完善填筑的施工工艺、措施","混凝土面板堆石坝在堆石填筑前,应进行坝料碾压试验.碾压试验的内容主要包括( )",{"answer":83,"createTime":55,"id":84,"options":85,"question":88,"source":30,"type":89},[],124376863,[86,87],"正确","错误","混凝土面板堆石坝坝体堆石料铺筑宜采用进占法,必要时可采用后退法与进占法结合卸料",3,{"answer":91,"createTime":55,"id":92,"options":93,"question":94,"source":30,"type":89},[],124376868,[86,87],"土石坝坝体防渗料可采用进占法或后退法卸料;砾质土、风化料、掺合土可视具体情况选择铺料方式",{"answer":96,"createTime":55,"id":97,"options":98,"question":99,"source":30,"type":89},[],124376872,[86,87],"混凝土面板堆石坝的上游坡面垫层料必须按设计轮廓线填筑施工,不得水平超宽"]