[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$faizb1B9Omsf0lPjku1e-GY99xkcYa83Eo--_z0wYE2A":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":19,"related":20,"source":31,"type":51},[],"2024-03-10 16:03:35",132743752,[8,9,10,11],"节约资金时间成本","单位面积建筑成本效益不明显","集群发展拉动地方经济","降低综合造价",{"count":13,"courseId":14,"courseImg":15,"courseName":16,"workId":17,"workName":18},53,"327e6f71b4b8dbe7ecf0ca4822acf8f6","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002Fc67cc80439e941fef9f8fef04d232b9e.jpg","装配式混凝土结构施工与组织","work_32455429","","装配式建筑的评价方法中.关于经济效益的说法不正确的是()",[21,33,42,52,62,65,74,83,93,102],{"answer":22,"createTime":23,"id":24,"options":25,"question":30,"source":31,"type":32},[],"2024-04-27 17:03:53",132743748,[26,27,28,29],"阶段性装修","工厂化生产","信息化管理","标准化设计","关于装配式建筑的特点,说法不正确的是( )","v1",1,{"answer":34,"createTime":23,"id":35,"options":36,"question":41,"source":31,"type":32},[],132743749,[37,38,39,40],"压力:连接钢筋抗压及后浇混凝土、灌浆料或座浆材料抗压","弯矩:连接钢筋传递","剪力:结合面混凝土的粘结强度、键槽或粗糙面、钢筋的摩擦抗剪作用、消栓抗剪作用承担","拉力:后浇混凝土、灌浆材料或座浆材料直接传递","PC构件之间的湿式连接传力途径描述正确的是( )",{"answer":43,"createTime":5,"id":44,"options":45,"question":50,"source":31,"type":51},[],132743750,[46,47,48,49],"生产、装修、运营维护","设计、施工、物业管理","设计、生产、施工","施工、装修、运营维护","装配式建筑工程采用工程总承包方式有利于形成()一体化的产业链",0,{"answer":53,"createTime":54,"id":55,"options":56,"question":61,"source":31,"type":32},[],"2024-04-27 17:03:52",132743751,[57,58,59,60],"改变建筑设计模式和建造方式","解决建筑市场劳动力资源短缺及劳动力成本增加的需要","建筑产业现代化的需求","建筑行业节能减排的需要","发展装配式建筑最主要的原因是( )",{"answer":63,"createTime":5,"id":6,"options":64,"question":19,"source":31,"type":51},[],[8,9,10,11],{"answer":66,"createTime":5,"id":67,"options":68,"question":73,"source":31,"type":51},[],132743753,[69,70,71,72],"框架结构","框架-剪力墙结构","剪力墙结构","现场人工浇筑结构","不属于装配式混凝土建筑结构的是()",{"answer":75,"createTime":54,"id":76,"options":77,"question":82,"source":31,"type":32},[],132743754,[78,79,80,81],"20%~35%","20%以下","50%以上","35%~50%","与混凝土结构的传统现浇生产方式对比,采用装配式建造方式可以减少现场人工数量()",{"answer":84,"createTime":85,"id":86,"options":87,"question":92,"source":31,"type":51},[],"2024-03-08 09:04:04",132743755,[88,89,90,91],"砌筑工程费","措施费","机械费","抹灰工程费","装配式混凝土建筑工程成本相比传统现浇方式增加的有()",{"answer":94,"createTime":54,"id":95,"options":96,"question":101,"source":31,"type":32},[],132743756,[97,98,99,100],"C20,C40,C25","C30,C40,C25","C30,C25,C40","C25,C30,C40","预制构件的混凝土强度等级不宜低于( ),预应力混凝土预制构件的混凝土强度等级不宜低于( ),现浇混凝土的强度等级不应低于( )",{"answer":103,"createTime":54,"id":104,"options":105,"question":106,"source":31,"type":32},[],132743757,[8,11,10,9],"装配式建筑综合效益分析中,关于经济效益的说法不正确的是( )"]