[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fPvYndNxEJRAHeJ8at6w3VjkrCK-nr0ZmnbRPM0B76p4":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":19,"related":20,"source":31,"type":32},[],"2024-03-10 16:16:14",132745525,[8,9,10,11],"运输效率不足导致运输费用较高","预制构件生产未实现规模效益","预制构件相对传统现浇做法费用有所提高","人工工资过高导致成本增加",{"count":13,"courseId":14,"courseImg":15,"courseName":16,"workId":17,"workName":18},53,"327e6f71b4b8dbe7ecf0ca4822acf8f6","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002Fc67cc80439e941fef9f8fef04d232b9e.jpg","装配式混凝土结构施工与组织","work_32455429","","引发装配式混凝土建筑工程增量成本的原因有( )",[21,33,42,53,63,72,81,90,100,109],{"answer":22,"createTime":23,"id":24,"options":25,"question":30,"source":31,"type":32},[],"2024-04-27 17:03:53",132743748,[26,27,28,29],"阶段性装修","工厂化生产","信息化管理","标准化设计","关于装配式建筑的特点,说法不正确的是( )","v1",1,{"answer":34,"createTime":23,"id":35,"options":36,"question":41,"source":31,"type":32},[],132743749,[37,38,39,40],"压力:连接钢筋抗压及后浇混凝土、灌浆料或座浆材料抗压","弯矩:连接钢筋传递","剪力:结合面混凝土的粘结强度、键槽或粗糙面、钢筋的摩擦抗剪作用、消栓抗剪作用承担","拉力:后浇混凝土、灌浆材料或座浆材料直接传递","PC构件之间的湿式连接传力途径描述正确的是( )",{"answer":43,"createTime":44,"id":45,"options":46,"question":51,"source":31,"type":52},[],"2024-03-10 16:03:35",132743750,[47,48,49,50],"生产、装修、运营维护","设计、施工、物业管理","设计、生产、施工","施工、装修、运营维护","装配式建筑工程采用工程总承包方式有利于形成()一体化的产业链",0,{"answer":54,"createTime":55,"id":56,"options":57,"question":62,"source":31,"type":32},[],"2024-04-27 17:03:52",132743751,[58,59,60,61],"改变建筑设计模式和建造方式","解决建筑市场劳动力资源短缺及劳动力成本增加的需要","建筑产业现代化的需求","建筑行业节能减排的需要","发展装配式建筑最主要的原因是( )",{"answer":64,"createTime":44,"id":65,"options":66,"question":71,"source":31,"type":52},[],132743752,[67,68,69,70],"节约资金时间成本","单位面积建筑成本效益不明显","集群发展拉动地方经济","降低综合造价","装配式建筑的评价方法中.关于经济效益的说法不正确的是()",{"answer":73,"createTime":44,"id":74,"options":75,"question":80,"source":31,"type":52},[],132743753,[76,77,78,79],"框架结构","框架-剪力墙结构","剪力墙结构","现场人工浇筑结构","不属于装配式混凝土建筑结构的是()",{"answer":82,"createTime":55,"id":83,"options":84,"question":89,"source":31,"type":32},[],132743754,[85,86,87,88],"20%~35%","20%以下","50%以上","35%~50%","与混凝土结构的传统现浇生产方式对比,采用装配式建造方式可以减少现场人工数量()",{"answer":91,"createTime":92,"id":93,"options":94,"question":99,"source":31,"type":52},[],"2024-03-08 09:04:04",132743755,[95,96,97,98],"砌筑工程费","措施费","机械费","抹灰工程费","装配式混凝土建筑工程成本相比传统现浇方式增加的有()",{"answer":101,"createTime":55,"id":102,"options":103,"question":108,"source":31,"type":32},[],132743756,[104,105,106,107],"C20,C40,C25","C30,C40,C25","C30,C25,C40","C25,C30,C40","预制构件的混凝土强度等级不宜低于( ),预应力混凝土预制构件的混凝土强度等级不宜低于( ),现浇混凝土的强度等级不应低于( )",{"answer":110,"createTime":55,"id":111,"options":112,"question":113,"source":31,"type":32},[],132743757,[67,70,69,68],"装配式建筑综合效益分析中,关于经济效益的说法不正确的是( )"]