[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fiGD494B0d89bp_RkLAd-smCvCkUEeQNBV39vg3tJqdU":3},{"id":4,"source":5,"question":6,"options":7,"answer":12,"related":13,"type":18,"origin":110,"createTime":20},142810293,"v1","在坝面作业中,对堆石干密度一般采用的测定方法是",[8,9,10,11],"环刀取样法","挖坑取样法","灌砂法","灌水法",[],[14,21,31,41,51,61,71,81,91,101],{"id":4,"source":5,"question":6,"options":15,"answer":16,"related":17,"type":18,"origin":19,"createTime":20},[8,9,10,11],[],[],0,null,"2024-05-11T18:12:15+08:00",{"id":22,"source":5,"question":23,"options":24,"answer":29,"related":30,"type":18,"origin":19,"createTime":20},142810294,"在开挖区未爆发之前先行爆破,保护保留岩体或邻近建筑物免受爆破破坏的是",[25,26,27,28],"洞室爆破法","预裂爆破法","浅孔爆破法","深孔爆破法",[],[],{"id":32,"source":5,"question":33,"options":34,"answer":39,"related":40,"type":18,"origin":19,"createTime":20},142810295,"选择截流方法时,不需要进行",[35,36,37,38],"截流材料的价格","水力学参数计算","考虑抛投物数量和性质","分析施工条件和难度",[],[],{"id":42,"source":5,"question":43,"options":44,"answer":49,"related":50,"type":18,"origin":19,"createTime":20},142810296,"围堰是保护大坝或厂房等水工建筑物干地施工的必要挡水建筑物,一般属",[45,46,47,48],"非固定性工程","临时性工程","永久性工程","固定性工程",[],[],{"id":52,"source":5,"question":53,"options":54,"answer":59,"related":60,"type":18,"origin":19,"createTime":20},142810297,"抢护管涌险情的原则应是",[55,56,57,58],"集中力量,堵死进口","水涨堤高","防止涌水带砂","上堵下排",[],[],{"id":62,"source":5,"question":63,"options":64,"answer":69,"related":70,"type":18,"origin":19,"createTime":20},142810298,"具有生产效率高等优点的碾压机械开行方式是",[65,66,67,68],"圈转套压法","进退错距法","圈转碾压法","进退平距法",[],[],{"id":72,"source":5,"question":73,"options":74,"answer":79,"related":80,"type":18,"origin":19,"createTime":20},142810299,"抓铲挖掘机可以挖掘停机面以上及以下的掌子,水利水电工程中常用于开挖的土类是",[75,76,77,78],"Ⅰ-Ⅲ类","砂","Ⅰ-Ⅳ类","Ⅰ-Ⅱ类",[],[],{"id":82,"source":5,"question":83,"options":84,"answer":89,"related":90,"type":18,"origin":19,"createTime":20},142810300,"围堰是保护水工建筑物干地施工的必要",[85,86,87,88],"挡水建筑物","过水建筑物","不过水建筑物","泄水建筑物",[],[],{"id":92,"source":5,"question":93,"options":94,"answer":99,"related":100,"type":18,"origin":19,"createTime":20},142810301,"下列不属于导流标准的是",[95,96,97,98],"导流建筑物级别","导流洪水标准","施工期临时度汛标准","导流时段",[],[],{"id":102,"source":5,"question":103,"options":104,"answer":108,"related":109,"type":18,"origin":19,"createTime":20},142810302,"汛期来临,漏洞险情发生时,最有效、最常用的方法是堵塞",[105,106,107,58],"漏洞出口","漏洞中部","漏洞进口",[],[],{"courseName":111,"courseImg":112,"workName":113,"workId":114,"count":115,"courseId":116},"水利水电工程管理与实务","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F1482698aa94b1c442f6091bffad3dc0b.jpg","《水利水电工程管理与实务》选修课-作业3","work_34322231",26,"d5c93af00b934896b31659c4c45ab366"]