[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fLkZYrhGoSYMMegw9jJVKCEFZKXwVddZHcCsbXLDFNnU":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":13,"question":20,"related":21,"source":32,"type":97},[],"2024-06-19 19:48:53",153367597,[8,9,10,11,12],"施工部署和施工方案","施工总进度计划","材料需要量计划","施工准备工作计划","施工总平面图",{"count":14,"courseId":15,"courseImg":16,"courseName":17,"workId":18,"workName":19},37,"47aec246413bbfa6c634d0794496a3dc","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002Fed5e1ec4c4cf4e79f6685c64b7bbbd46.jpg","工程施工组织","work_35677473","2024年6月13日理论B 2.3物联网主要应用领域","施工组织总设计中,最重要的三项内容是( )",[22,34,43,49,58,67,76,85,94,98],{"answer":23,"createTime":24,"id":25,"options":26,"question":31,"source":32,"type":33},[],"2024-06-14 14:52:47",151450335,[27,28,29,30],"施工部署和施工方案-施工总平面图-施工总进度计划","施工总平面图-施工部署和施工方案一施工总进度计划","施工总进度计划一施工总平面图一施工部署和施工方案","施工部署和施工方案一施工总进度计划-施工总平面图","编制施工组织总设计时,几项重点内容编制顺序正确的是( )","v1",0,{"answer":35,"createTime":24,"id":36,"options":37,"question":42,"source":32,"type":33},[],151450336,[38,39,40,41],"是否满足总工期及起止时间的要求","是否采用了流水施工方法","流水节拍和流水步距是否正确","间歇时间和搭接时间是否合理","初步(可行)施工总进度计划绘制完成后,应对其进行检查.检査的首要内容是 ( )",{"answer":44,"createTime":24,"id":45,"options":46,"question":48,"source":32,"type":33},[],151450337,[12,47,9,11],"施工方案","编制施工组织总设计中的材料、机具设备和劳动力的配置计划时,均需依据( )",{"answer":50,"createTime":24,"id":51,"options":52,"question":57,"source":32,"type":33},[],151450338,[53,54,55,56],"制定施工方案","确定工期","编制进度计划","规划暂设工程","劳动力配置计划是()和组织劳动力进场的依据",{"answer":59,"createTime":24,"id":60,"options":61,"question":66,"source":32,"type":33},[],151450339,[62,63,64,65],"施工、机械、生活用水量之和大于消防用水量","施工、机械、生活用水量之和等于消防用水量","施工、机械、生活用水量之和小于消防用水量,且工地面积大于10hm2","施工、机械、生活用水量之和小于消防用水量,且工地面积小于5hm2","在计算施工现场临时用水量时,可将消防用水量作为临时总用水量的条件是( )",{"answer":68,"createTime":24,"id":69,"options":70,"question":75,"source":32,"type":33},[],151450340,[71,72,73,74],"④一►③一►②一►⑥一►①-►⑤","④一►①一►②一►⑤一►⑥-►③","⑤一►④-►③一►①一►②一►⑥","⑤一►①一►②-►③一►⑥一►④","施工总平面图的设计的主要内容包括:①布置仓库与材料堆场;②布置加工厂和 搅拌站;③布置临时水电管网;④引入场外交通道路;⑤布置内部运输道路;⑥布置临时设施.试选择正确的设计顺序( )",{"answer":77,"createTime":24,"id":78,"options":79,"question":84,"source":32,"type":33},[],151450341,[80,81,82,83],"布置仓库","引入场外交通道路","布置临时房屋","布置场内运输道路","设计施工总平面图的第一步应是( )",{"answer":86,"createTime":24,"id":87,"options":88,"question":93,"source":32,"type":33},[],151450342,[89,90,91,92],"一字形","U形","环形","L形","施工现场的道路干线应采用( )布置",{"answer":95,"createTime":5,"id":6,"options":96,"question":20,"source":32,"type":97},[],[8,9,10,11,12],1,{"answer":99,"createTime":5,"id":100,"options":101,"question":107,"source":32,"type":97},[],153367598,[102,103,104,105,106],"项目组织体系","主要项目的施工方案","施工控制目标与项目展开程序","主要施工准备工作的规划","施工区域划分与组织安排","施工组织总设计中的施工部署的内容一般包括( )"]