[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fDeSuel2AK7WbQTQoMsw6mOoiveowrF1BbPmVtwMLE6I":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":19,"related":20,"source":31,"type":32},[],"2024-06-24 15:12:46",154951979,[8,9,10,11],"基础断面积&times;挖土深度","基础垫层底面积&times;挖土深度","基础底面积&times;室外地坪至基底深度","基础垫层底面积&times;垫层厚度",{"count":13,"courseId":14,"courseImg":15,"courseName":16,"workId":17,"workName":18},149,"ef6ae58e2e852075ba4a7c035468b065","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002Fbcaa1698bdca0aa9023c7fb153830062.jpg","工程量清单计价","work_35787393","基础知识(一)","根据《房屋建筑与装饰工程工程量计规范》(GB50854-2013),挖沟槽土方的计算方法是",[21,33,42,51,60,69,78,87,96,105],{"answer":22,"createTime":23,"id":24,"options":25,"question":30,"source":31,"type":32},[],"2024-06-24 15:12:45",154951970,[26,27,28,29],"1216","1300","900","1350","某建筑首层平面图中,外墙外边线的尺寸为65m&times;20m,其平整场地清单工程量为m2","v1",0,{"answer":34,"createTime":23,"id":35,"options":36,"question":41,"source":31,"type":32},[],154951971,[37,38,39,40],"工程量清单应由有编制能力的投标人编制","工程量清单不是招标文件的组成部分","工程量清单应由有编制能力的招标人编制","工程量清单不是合同的组成部分","以下关于工程量清单说法正确的是",{"answer":43,"createTime":23,"id":44,"options":45,"question":50,"source":31,"type":32},[],154951972,[46,47,48,49],"专业工程暂估价","人工暂估单价","工程设备暂估单价","材料暂估单价","暂估价不包括的是",{"answer":52,"createTime":23,"id":53,"options":54,"question":59,"source":31,"type":32},[],154951973,[55,56,57,58],"分部分项工程费","措施费","规费","企业管理费","根据《房屋建筑与装饰工程工程量计规范》(GB50854-2013),混凝土、钢筋混凝土模板费属于",{"answer":61,"createTime":23,"id":62,"options":63,"question":68,"source":31,"type":32},[],154951974,[64,65,66,67],"暂估价","暂列金额","计日工","总承包服务费","对于施工中可能发生的工程变更、发生的索赔、现场签证确认等费用应计入",{"answer":70,"createTime":23,"id":71,"options":72,"question":77,"source":31,"type":32},[],154951975,[73,74,75,76],"计日工应按综合单价计价,投标时应计入投标总价","计日工表格中的项目名称、数量和单价应由招标人填写","计日工是招标人预留的部分,根据施工中的实际情况支付","计日工是指为配合协调招标人进行的工程分包和材料采购所需的费用","对于其他项目清单中的计日工,下列表述中正确的是",{"answer":79,"createTime":23,"id":80,"options":81,"question":86,"source":31,"type":32},[],154951976,[82,83,84,85],"展开面积","面积","长度","体积","根据《房屋建筑与装饰工程工程量计规范》(GB50854-2013),楼地面变形缝清单工程量按设计图示以计算",{"answer":88,"createTime":23,"id":89,"options":90,"question":95,"source":31,"type":32},[],154951977,[91,92,93,94],"米","吨","个","垂直投影面积","根据《房屋建筑与装饰工程工程量计规范》(GB50854-2013),清单工程量计量金属暖气罩的计量规则是",{"answer":97,"createTime":5,"id":98,"options":99,"question":104,"source":31,"type":32},[],154951978,[100,101,102,103],"水平投影面积","建筑面积","构件实体积","模板与混凝土构件的接触面积","根据《房屋建筑与装饰工程工程量计规范》(GB50854-2013),根据《房屋建筑与装饰工程工程量计算规范》,现浇混凝土基础模板工程量按计算",{"answer":106,"createTime":5,"id":6,"options":107,"question":19,"source":31,"type":32},[],[8,9,10,11]]