[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fUMrxYAdHEBZqZ8-G3mhQ5NnVg67ZoWia4oX-d6lpk1Y":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":19,"related":20,"source":24,"type":25},[],"2024-10-13 17:50:46",161543950,[8,9,10,11],"均为3","分别为6和3","均为6","分别为11和8",{"count":13,"courseId":14,"courseImg":15,"courseName":16,"workId":17,"workName":18},54,"11f377cb605fbfdfd89332d32dcf29f6","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002Fde3478b102d9d639dc9b631ffe74e5ae.png","铁路施工组织设计与概预算","exam_132919654","阶段测试二","在某工程双代号网络计划中,工作M的最早开始时间为第17天,其持续时间为5天.该工作有三项紧后工作,它们的最早开始时间分别为第25天、第27天和第30天,最迟开始时间分别为第28天、第29天和第30天,则工作M的总时差和自由时差()天",[21,26,35,44,53,62,71,80,89,98],{"answer":22,"createTime":5,"id":6,"options":23,"question":19,"source":24,"type":25},[],[8,9,10,11],"v1",0,{"answer":27,"createTime":5,"id":28,"options":29,"question":34,"source":24,"type":25},[],161543951,[30,31,32,33],"基本预备费","工程造价增长预留费","铺底流动资金","建设期投资贷款利息","为保证新建铁路项目投产初期正常运营所需流动资金有可靠来源,而计列本项费用.主要用于购买原材料、燃料、动力,支付职工工资和其他有关费用",{"answer":36,"createTime":5,"id":37,"options":38,"question":43,"source":24,"type":25},[],161543952,[39,40,41,42],"0.5个月","1个月","1.5个月","2个月","对于大中桥当桥头填土高度大于12米时,要不路基提前多长时间完工( )",{"answer":45,"createTime":5,"id":46,"options":47,"question":52,"source":24,"type":25},[],161543953,[48,49,50,51],"14天","15天","16天","17天","已知在工作网络计划中,某工作有四项紧后工作,它们的最迟开始时间分别为第19天、第20天、第21天和第23天.如果该工作的持续时间为4天,则其最迟开始时间为( )",{"answer":54,"createTime":5,"id":55,"options":56,"question":61,"source":24,"type":25},[],161543954,[57,58,59,60],"设计概算","施工预算","施工图预算","工程结算","是施工单位进行成本控制与成本核算的依据",{"answer":63,"createTime":5,"id":64,"options":65,"question":70,"source":24,"type":25},[],161543955,[66,67,68,69],"明确表达各项工作之间的逻辑关系","直观表达工程进度计划的计算工期","明确表达各项工作之间的搭接时间","直观表示各项工作的持续时间","在建设工程进度计划的表示方法中,与横道计划相比,网络计划的优点是能够( )",{"answer":72,"createTime":5,"id":73,"options":74,"question":79,"source":24,"type":25},[],161543956,[75,76,77,78],"所有紧前工作最早完成时间的最大值","所有紧前工作最早完成时间的最小值","所有紧前工作最迟完成时间的最大值","所有紧前工作最迟完成时间的最小值","网络计划中,工作最早开始时间应为()",{"answer":81,"createTime":5,"id":82,"options":83,"question":88,"source":24,"type":25},[],161543957,[84,85,86,87],"与地方行政区划分相结合","一般以独立经济核算的综合工程为划分单元","考虑地方和铁路不同工资区的划分","工程量以及机具配备可不作为考虑范围之内","下列内容哪一个不属于施工区段的划分原则( )",{"answer":90,"createTime":5,"id":91,"options":92,"question":97,"source":24,"type":25},[],161543958,[93,94,95,96],"在不影响总工期的前提下,该工作可以利用的机动时间","在不影响其紧后工作最迟开始的前提下,该工作可以利用的机动时间","在不影响其紧后工作最迟完成时间的前提下,该工作可以利用的机动时间","在不影响其紧后工作最早开始时间的前提下,该工作可以利用的机动时间","工作自由时差是指( )",{"answer":99,"createTime":5,"id":100,"options":101,"question":106,"source":24,"type":25},[],161543959,[102,103,104,105],"57.2m2","64.1 m2","83.6 m2","96.2m2","某工程队修建挡土墙工程,工期为60天,水泥总需要量为125t,计算水泥库的需用面积.(查表DX = 30d,bx=1.3 ,Kf = 0.5)"]