[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fvSzp0f7Xi_rmCfqfRYSMVpo3aIhKK2xJf-vBuJzy0ME":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":19,"related":20,"source":30,"type":31},[],"2024-10-31 17:59:49",163942457,[8,9,10,11],"水平","垂直","倾斜","水平+垂直",{"count":13,"courseId":14,"courseImg":15,"courseName":16,"workId":17,"workName":18},25,"cbb207d7342370c1c6519ac1761ae87e","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F7e22126c9a5e3efc39c6e712b0c0520a.jpg","建筑工程计量与计价","42795be8414c40de8c96d977f5280156","工程量清单计价","台阶面层(包括踏步及最上一层踏步沿300mm)按( )投影面积计算",[21,32,41,50,58,67,76,85,88,94],{"answer":22,"createTime":5,"id":23,"options":24,"question":29,"source":30,"type":31},[],163942447,[25,26,27,28],"伸入墙内的梁头、梁垫并入梁的体积","梁与柱连接时,梁长算至柱侧面","主梁与次梁连接时,次梁算至主梁侧面","扣除钢筋、预埋铁件所占体积","计算现浇混凝土梁的工程量时错误的做法是( )","v1",0,{"answer":33,"createTime":5,"id":34,"options":35,"question":40,"source":30,"type":31},[],163942448,[36,37,38,39],"伸出外墙外边线的水平投影面积","体积","按延长米","翻起面积","雨蓬的混凝土工程量按( )计算",{"answer":42,"createTime":5,"id":43,"options":44,"question":49,"source":30,"type":31},[],163942449,[45,46,47,48],"单独计算","不计算","并入粱体积内","按体积一半计算","预埋件所占体积,伸入墙内的粱头,粱垫()",{"answer":51,"createTime":5,"id":52,"options":53,"question":57,"source":30,"type":31},[],163942450,[46,54,55,56],"单独计算,套用相应定额","并入柱身体积内计算","并入柱身体乘1.01难度系数","钢筋混凝土构造柱工程量按体积计算,与砖墙嵌接部分的体积( )",{"answer":59,"createTime":5,"id":60,"options":61,"question":66,"source":30,"type":31},[],163942451,[62,63,64,65],"模板工程量","图示尺寸实体体积以&quot;立方米&quot;计算","图示尺寸体积以 &quot;立方米&quot;计算","实际浇注体积计算","现浇混凝土工程量除另外有规定外,均按( )计算工程量",{"answer":68,"createTime":5,"id":69,"options":70,"question":75,"source":30,"type":31},[],163942453,[71,72,73,74],"200mm","250mm","300mm","400mm","过梁长度按门窗洞口外围宽度两端各加( )计算",{"answer":77,"createTime":5,"id":78,"options":79,"question":84,"source":30,"type":31},[],163942455,[80,81,82,83],"板的体积计算","板和柱帽体积之和计算","不同板厚以水平投影面积计算","按板的体积乘以系数计算","根据《湖北省消耗量计算规则》的规定,现浇钢筋混凝土无梁楼板的混凝土工程量按( )",{"answer":86,"createTime":5,"id":6,"options":87,"question":19,"source":30,"type":31},[],[8,9,10,11],{"answer":89,"createTime":5,"id":90,"options":91,"question":93,"source":30,"type":31},[],163942459,[92,71,73,74],"100mm","现浇混凝土台阶按设计图示尺寸以水平投影面积计算时,应以最上层踏步外沿加( )",{"answer":95,"createTime":5,"id":96,"options":97,"question":102,"source":30,"type":31},[],163942461,[98,99,100,101],"钢筋、模板套同项","钢筋、模板可分别套项","钢筋、模板和混凝土套同项","钢筋、模板和混凝土可分别套项","有矩形柱100m3,套用定额时( )"]