[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$f7LHYjZoDaHB4vqSWY9Cb6gdnstljdr-S54IzXMtySVI":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":19,"related":20,"source":31,"type":32},[],"2024-11-15 08:59:43",165961157,[8,9,10,11],"(6.54+0.03ⅹ2)ⅹ(7.04+0.03ⅹ2)-3.3ⅹ1.8","6.54ⅹ7.04-3.3ⅹ1.8","3.3ⅹ5+3ⅹ6.8","6.54ⅹ7.04-3.3ⅹ1.8+4ⅹ(6.54+7.04)+16",{"count":13,"courseId":14,"courseImg":15,"courseName":16,"workId":17,"workName":18},43,"9a261fd791881d746e822b1f86324715","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002Fb0e1e389a29ecc3dc802690c8e62f62a.jpg","【2024秋】工程概预算课程设计","work_36029754","课程设计作业","下列关于平整场地的工程量计算正确的是( )",[21,33,43,52,57,66,75,84,93,102],{"answer":22,"createTime":23,"id":24,"options":25,"question":30,"source":31,"type":32},[],"2024-11-15 13:08:07",165074673,[26,27,28,29],"①④","②③","①③","②④","某工程项目的场地平整工作已经完成,已将施工现场平整到设计室外地坪标高.下列关于基础土方开挖深度的说法正确的是( ). ①计算清单工程量时从基础底面标高计算至设计室外地坪标高 ②计算清单工程量时从基础垫层底面标高计算至设计室外地坪标高 ③计算计价工程量时从基础底面标高计算至交付施工场地标高 ④计算计价工程量时从基础垫层底面标高计算至交付施工场地标高","v1",0,{"answer":34,"createTime":35,"id":36,"options":37,"question":42,"source":31,"type":32},[],"2024-11-08 21:16:22",165074674,[38,39,40,41],"如果是租赁的垂直运输机械,宜以天为计量单位","它是一个单价措施项目","计量单位可以是m2,也可以是天","它是一个分部分项工程项目","关于垂直运输的说法错误的是( )",{"answer":44,"createTime":35,"id":45,"options":46,"question":51,"source":31,"type":32},[],165074675,[47,48,49,50],"过梁每边伸入墙内250mm","过梁的截面尺寸为240mmⅹ120mm","窗户上方不需要设过梁","有6根过梁","本课程设计中,关于过梁的说法错误的是( )",{"answer":53,"createTime":23,"id":54,"options":55,"question":56,"source":31,"type":32},[],165074676,[27,26,29,28],"某现浇钢筋混凝土框架结构层高4.5m,柱截面500mm&times;500mm,与柱相交的两根梁截面为300mm&times;600mm,板厚100mm,采用组合钢模板和钢支撑,套用湖北省2018版预算定额,则下列说法中正确的是( ). ①模板的清单工程量是8.5\u003Cimg src=\"https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002Ff48453906a8497a185533dcc2caed3e7.webp\"> ②模板的计价工程量是8.8\u003Cimg src=\"https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F67c043dd12bc1f0bb4ffb805e7f29b13.webp\"> ③模板和支撑的全费用是699.67元 ④模板和支撑的全费用是670.09元",{"answer":58,"createTime":23,"id":59,"options":60,"question":65,"source":31,"type":32},[],165074677,[61,62,63,64],"以立方米计算,按设计图示截面积乘以桩长(包括桩尖)以实体积计算","以吨计算,按设计图示尺寸以质量计算","以根计量,按设计图示数量计算","以米计算,按设计图示尺寸以桩长(包括桩尖)计算","依据《房屋建筑与装饰工程工程量计算规范》,打预制钢筋混凝土方桩的工程量计算规则错误的是( )",{"answer":67,"createTime":23,"id":68,"options":69,"question":74,"source":31,"type":32},[],165074678,[70,71,72,73],"按保温隔热屋面列项","工程量计算式是6.06ⅹ4.76+2.76ⅹ1.8","项目编码是011001001001","按设计图示尺寸以体积计算","本课程设计中,在钢筋混凝土屋面板上做1:6水泥炉渣找坡层,最薄处60mm(坡度2%).关于水泥炉渣找坡层工程量计算的说法错误的是( )",{"answer":76,"createTime":23,"id":77,"options":78,"question":83,"source":31,"type":32},[],165074679,[79,80,81,82],"②③⑤","①②③④⑤⑥","①③⑥","③⑥","本课程设计的总价措施项目清单与计价表里应包括( ). ①二次搬运费 ②综合脚手架费 ③安全文明施工费 ④夜间施工增加费 ⑤冬雨季施工增加费 ⑥已完工程及设备保护费",{"answer":85,"createTime":23,"id":86,"options":87,"question":92,"source":31,"type":32},[],165074680,[88,89,90,91],"按设计图示尺寸以面积计算,梁两侧抹灰和刷乳胶漆的工程量不需要计量","工程量计算式是3.3ⅹ5+3ⅹ(3.2+3.6)","只有天棚抹灰(项目编码011301001001)这一个项目","有天棚抹灰(项目编码011301001001)和抹灰面油漆(项目编码011406001001)这两个项目","本课程设计中,天棚面层工程量计算说法正确的是( )",{"answer":94,"createTime":23,"id":95,"options":96,"question":101,"source":31,"type":32},[],165074681,[97,98,99,100],"平板","无梁板","其他板","有梁板","本课程设计中,现浇混凝土屋面板应套用( )",{"answer":103,"createTime":104,"id":105,"options":106,"question":109,"source":31,"type":32},[],"2024-11-11 22:33:52",165074682,[107,108,108,107],"\u002F钢筋间距+1","\u002F钢筋间距+1,再向上取整","关于板的钢筋数量计算说法正确的是( )"]