[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fSg9TO6sPuYZjTIvn9DbGBLklriyNVTRm1prpr7TRfQ8":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":19,"related":20,"source":31,"type":32},[],"2024-12-29 14:17:37",170085758,[8,9,10,11],"选定建设监理单位及主体工程施工承包商","完成施工图设计","完成施工用水、电等工程","施工现场的征地、拆迁",{"count":13,"courseId":14,"courseImg":15,"courseName":16,"workId":17,"workName":18},74,"d5c93af00b934896b31659c4c45ab366","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F1482698aa94b1c442f6091bffad3dc0b.jpg","水利水电工程管理与实务","work_39617136","《水利水电工程管理与实务》选修课-作业5","建设项目在主体工程开工之前,必须完成各项施工准备工作,其主要工作内容不包括",[21,33,43,53,62,71,80,89,98,107],{"answer":22,"createTime":23,"id":24,"options":25,"question":30,"source":31,"type":32},[],"2024-12-18 10:48:00",170085721,[26,27,28,29],"一类负荷","三类负荷","四类负荷","二类负荷","水利水电工程施工中,汛期的防洪、泄洪设施的用电负荷属于","v1",0,{"answer":34,"createTime":35,"id":36,"options":37,"question":42,"source":31,"type":32},[],"2024-12-22 17:05:20",170085726,[38,39,40,41],"1.5m","2.0m","1.2m","1.8m","钢脚手架的立杆的间距不大于",{"answer":44,"createTime":45,"id":46,"options":47,"question":52,"source":31,"type":32},[],"2024-12-25 22:59:57",170085730,[48,49,50,51],"4.5m","5m","3.5m","4m","根据施工生产防火安全的需要,合理布置消防通道和各种防火标志,消防通道应保持通畅,宽度不得小于",{"answer":54,"createTime":45,"id":55,"options":56,"question":61,"source":31,"type":32},[],170085734,[57,58,59,60],"交流电源:一般爆破不小于3A","直流电源:洞室爆破或大规模爆破不小于3.5A","直流电源:一般爆破不小于2.5A","交流电源:洞室爆破或大规模爆破不小于4A","电力起爆中,供给每个电雷管的实际电流应大于准爆电流,下列要求错误的是",{"answer":63,"createTime":5,"id":64,"options":65,"question":70,"source":31,"type":32},[],170085738,[66,67,68,69],"8m","9m","6m","7m","施工现场的机动车道与外电架空线路(电压1-10KV)交叉时,架空线路的最低点与路面的垂直距离应不小于",{"answer":72,"createTime":23,"id":73,"options":74,"question":79,"source":31,"type":32},[],170085742,[75,76,77,78],"特级企业","大型企业","三级企业","二级企业","电站总装机容量88MW的水电站工程按照建设规模和效益以及在国民经济中的重要性,划分属于",{"answer":81,"createTime":35,"id":82,"options":83,"question":88,"source":31,"type":32},[],170085746,[84,85,86,87],"强制性的等下监督管理","项目法人的决策方","项目法人的委托方","中介组织对工程建设的监督管理","质量监督机构对工程项目实施监督在性质上属于",{"answer":90,"createTime":23,"id":91,"options":92,"question":97,"source":31,"type":32},[],170085750,[93,94,95,96],"工程竣工验收前","蓄水验收前","出现质量事故后24小时内","竣工验收后5年内","水库大坝实行定期安全鉴定制度,首次安全鉴定时间为",{"answer":99,"createTime":45,"id":100,"options":101,"question":106,"source":31,"type":32},[],170085755,[102,103,104,105],"5%以下","20%以下","15%以下","10%以下","实施代建的水利工程建设项目,对代建单位的奖励控制在代建管理费",{"answer":108,"createTime":5,"id":6,"options":109,"question":19,"source":31,"type":32},[],[8,9,10,11]]