[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fSU2L0FGecmcL_eUZ0PEPts-txZV_Z9TDfMvLWjJNQP0":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":19,"related":20,"source":30,"type":31},[],"2024-12-19 16:29:33",172317596,[8,9,10,11],"铲土","运土","填筑","推土",{"count":13,"courseId":14,"courseImg":15,"courseName":16,"workId":17,"workName":18},120,"e5c8911a0d40d8e7f0540f903f6a3d98","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002Ff12a40eddc0470d5a59869e07b723dda.jpg","建筑工程施工技术","work_39827631","2024年秋季复习题","铲运机主要功能不包括( )",[21,32,41,50,59,68,77,86,95,98],{"answer":22,"createTime":5,"id":23,"options":24,"question":29,"source":30,"type":31},[],172317588,[25,26,27,28],"8","6","12","5","我国《建筑地基基础设计规范》中将作为建筑地基的岩土分为( )类","v1",0,{"answer":33,"createTime":5,"id":34,"options":35,"question":40,"source":30,"type":31},[],172317589,[36,37,38,39],"三类","五类","八类","六类","根据土的开挖难易程度,土的工程分类可分为( )",{"answer":42,"createTime":5,"id":43,"options":44,"question":49,"source":30,"type":31},[],172317590,[45,46,47,48],"土与湿土的重量之比的百分数","水与干土的重量比的百分数","水重与孔隙体积之比的百分数","水与干土的体积之比的百分数","土的含水率是指土中的( )",{"answer":51,"createTime":5,"id":52,"options":53,"question":58,"source":30,"type":31},[],172317591,[54,55,56,57],"土的干密度","土的压实度","土的压缩比","土的可松性","作为检验填土压实质量控制指标的是( )",{"answer":60,"createTime":5,"id":61,"options":62,"question":67,"source":30,"type":31},[],172317592,[63,64,65,66],"正铲挖土机配合自卸汽车","铲运机","推土机","装载机","某场地平整工程,运距为100-400m,土质为松软土和普通土,地形起伏坡度为15&deg;内,适宜使用的机械为()",{"answer":69,"createTime":5,"id":70,"options":71,"question":76,"source":30,"type":31},[],172317593,[72,73,74,75],"800M3","962M3","1250M3","1050M3","某土方工程挖方量为1000M3,已知该土的Ks=1.25,Ks'=1.05,实际需运走的土方是( )",{"answer":78,"createTime":5,"id":79,"options":80,"question":85,"source":30,"type":31},[],172317594,[81,82,83,84],"5m","5.5m","6m","6.5m","某轻型井点采用环状布置,井管埋设面距基坑底的垂直距离为4m,井点管至基坑中心线的水平距离为10m,则井点管的埋设深度(不包括滤管长)至少应为( )",{"answer":87,"createTime":5,"id":88,"options":89,"question":94,"source":30,"type":31},[],172317595,[90,91,92,93],"40-50M","60-80M","70-100M","30-60M","推土机在平土或移挖操作填时,最为有效运距为( )",{"answer":96,"createTime":5,"id":6,"options":97,"question":19,"source":30,"type":31},[],[8,9,10,11],{"answer":99,"createTime":5,"id":100,"options":101,"question":106,"source":30,"type":31},[],172317597,[102,103,104,105],"200㎜","300㎜","500㎜","1000㎜","筏型基础及箱型基础施工前,如地下水位较高,可采用人工降低水平线至基坑以下不少于( ),以保证在无水情况下进行基础施工"]