[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fLAiH2SS-NH4nRdZwAAy_BaMXted142KE5ID6mgERwm8":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":19,"related":20,"source":24,"type":25},[],"2024-12-25 12:13:51",173849814,[8,9,10,11],"单项工程","单位工程","分部工程","分项工程",{"count":13,"courseId":14,"courseImg":15,"courseName":16,"workId":17,"workName":18},83,"84873848b52c2afb0b8455ece6748f7a","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002Fdb4e8305dedf96ff453180e136cd6a1d.jpg","建筑工程计量与计价","work_39804392","批量身份证号码提取个人信息","基本建设项目的划分中土石方工程属于()",[21,26,35,44,53,62,71,80,89,98],{"answer":22,"createTime":5,"id":6,"options":23,"question":19,"source":24,"type":25},[],[8,9,10,11],"v1",0,{"answer":27,"createTime":5,"id":28,"options":29,"question":34,"source":24,"type":25},[],173849817,[30,31,32,33],"投资估算","设计概算","施工图预算","竣工结算","是指建设工程承包商在单位工程竣工后,根据施工合同、设计变更、现场技术签证、费用签证等资料,编制的确定工程竣工结算造价的经济文件",{"answer":36,"createTime":5,"id":37,"options":38,"question":43,"source":24,"type":25},[],173849820,[39,40,41,42],"混凝土换算","砂浆换算","系数换算","其他换算","在&quot;土石方工程&quot;中,沟槽、基坑深度超过6m时,按深6m定额乘以系数1.2计算;超过8m以外者,按深6m定额乘以系数1.6计算.此规定为()",{"answer":45,"createTime":5,"id":46,"options":47,"question":52,"source":24,"type":25},[],173849823,[48,49,50,51],"974.4","656.81","97.44","65.68","某预算定额砌10m3砖基础的综合用工为12.18工日\u002F10m3,人工单价为80元\u002F工日,则该定额项目的人工费为()元\u002F10m3",{"answer":54,"createTime":5,"id":55,"options":56,"question":61,"source":24,"type":25},[],173849826,[57,58,59,60],"材料原价","材料运杂费","运输损耗费","检验试验费","以下费用不属于材料单价组成的是()",{"answer":63,"createTime":5,"id":64,"options":65,"question":70,"source":24,"type":25},[],173849829,[66,67,68,69],"平整场地","挖一般土方","挖沟槽土方","挖基坑土方","土方开挖公式V挖=(a+2c+KH)&times;(b+2c+KH)H+1\u002F3K2H3,其中a、b为基础垫层底面长度、宽度,c为工作面,K为放坡系数,H为挖土深度.该公式是()工程量计算式",{"answer":72,"createTime":5,"id":73,"options":74,"question":79,"source":24,"type":25},[],173849832,[75,76,77,78],"以平方米计量,按设计图示尺寸以水平投影面积计算.不扣除宽度&lt;500mm的楼梯井﹐伸入墙内部分不计算","以立方米计量,按实际尺寸以体积计算","整体楼梯(包括直形楼梯、弧形楼梯)水平投影面积包括平台梁,斜梁和楼梯的连接梁,不包括休息平台","当整体楼梯与现浇楼板无梯梁连接时,以楼梯的最后一个踏步边缘加300mm为界","根据房屋建筑与装饰工程工程量计算规范(GB50854-2013),钢筋混凝土楼梯清单计算规则描述正确的是()",{"answer":81,"createTime":5,"id":82,"options":83,"question":88,"source":24,"type":25},[],173849835,[84,85,86,87],"按柱基上表面(或楼板上表面)至上一层楼板下表面之间的高度计算","按柱基上表面(或楼板上表面)至上一层楼板上表面之间的高度计算","按柱基上表面至柱帽上表面之间的高度计算","自柱基上表面(或楼板上表面)至柱帽下表面之间的高度计算","有梁板的柱高()",{"answer":90,"createTime":5,"id":91,"options":92,"question":97,"source":24,"type":25},[],173849838,[93,94,95,96],"材料净用量&times;损耗率","材料净用量&times;(1+损耗率)","材料净用量+运输堆放损耗量","材料净用量+运输损耗量","材料消耗量=()",{"answer":99,"createTime":5,"id":100,"options":101,"question":106,"source":24,"type":25},[],173849843,[102,103,104,105],"4.27工日","106.8工日","22.25工日","5.37工日","某工程砖基础工程量为120m&sup3;,每天有25名工人投入施工,时间定额为0.89工日\u002Fm&sup3;,试计算完成该项基础工程的定额施工天数.()"]