[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fKSqyhEYbIGnhJtodfW_93tJh8uEtaYLeNaM3MvIj1GA":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":13,"question":20,"related":21,"source":32,"type":113},[],"2025-01-02 11:44:27",175761006,[8,9,10,11,12],"具有良好的商业信誉和健全的财务会计制度","达到注册资本金和营业收入的要求","具有独立承担民事责任的能力","有依法缴纳税收和社会保障资金的良好记录","具有履行合同所必需的设备和专业技术能力",{"count":14,"courseId":15,"courseImg":16,"courseName":17,"workId":18,"workName":19},146,"ed5dd06667bc01326796de6572ce06ca","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F9c1d73a925deb6e1ac16335a12a23699.png","政府采购","exam_146548134","2024-2025第一学期政府采购期末试卷","《政府采购法》第二十二条规定的是供应商参加政府采购活动需具备的条件包括",[22,34,43,53,62,71,80,89,98,104],{"answer":23,"createTime":24,"id":25,"options":26,"question":31,"source":32,"type":33},[],"2025-01-02 11:44:24",175760896,[27,28,29,30],"10","20","5","15","澄清或者修改的内容可能影响投标文件、资格预审申请文件、响应文件编制的,采购人或者采购代理机构发布澄清公告并以书面形式通知潜在供应商的时间,应当在投标截止时间至少( )日前、提交资格预审申请文件截止时间至少3日前,或者提交首次响应文件截止之日3个工作日前;不足上述时间的,应当顺延提交投标文件、资格预审申请文件或响应文件的截止时间","v1",0,{"answer":35,"createTime":5,"id":36,"options":37,"question":42,"source":32,"type":33},[],175760897,[38,39,40,41],"招标人无须将中标结果通知所有未中标的投标人","招标人应当向中标人发出中标通知书,并同时将中标结果通知所有未中标的投标人","招标人应当先将中标结果通知所有未中标的投标人,然后向中标人发出中标通知书","招标人应当向先中标人发出中标通知书,并在与中标人订立合同后再将中标结果通知所有未中标的投标人","关于招标人发出中标结果通知,下列说法正确的是",{"answer":44,"createTime":45,"id":46,"options":47,"question":52,"source":32,"type":33},[],"2025-01-02 11:44:25",175760899,[48,49,50,51],"20日","15工作日","3工作日","10日","货物和服务项目实行竞争性谈判方式采购的,自招标文件开始发出之日起至投标人提交投标文件截止之日止,不得少于( )",{"answer":54,"createTime":45,"id":55,"options":56,"question":61,"source":32,"type":33},[],175760901,[57,58,59,60],"由市以上人民政府设立","属于营利性企业","属于非营利性事业单位","代理集中采购目录之内的采购","下列关于社会中介采购代理机构表述正确的是",{"answer":63,"createTime":45,"id":64,"options":65,"question":70,"source":32,"type":33},[],175760903,[66,67,68,69],"传统模式","集中采购","分散采购","零星采购","由政府设立的职能机构统一为其他政府机构提供采购服务的组织实施模式是 政府采购模式",{"answer":72,"createTime":45,"id":73,"options":74,"question":79,"source":32,"type":33},[],175760905,[75,76,77,78],"超出投标有效期15天","超出投标有效期60天","超出投标有效期30天","与投标有效期一致","投标保证金有效期应当",{"answer":81,"createTime":45,"id":82,"options":83,"question":88,"source":32,"type":33},[],175760907,[84,85,86,87],"邀请供应商;公开唱标;谈判;最终报价;确定供应商","成立谈判小组;邀请供应商报价;确定供应商","邀请供应商;谈判;最终报价;确定供应商","成立谈判小组;制定谈判文件;确定邀请参加谈判的供应商名单;谈判小组评审;确定成交供应商","采用竞争性磋商谈判方式采购的,应当遵循下列程序 ( )",{"answer":90,"createTime":45,"id":91,"options":92,"question":97,"source":32,"type":33},[],175760908,[93,94,95,96],"近三年的会计报告","有效的营业执照","有效的资质证书","有效的信用中国查询记录","资格审核过程中判断供应商具有履行合同的专业能力的方法包括",{"answer":99,"createTime":45,"id":100,"options":101,"question":103,"source":32,"type":33},[],175760909,[102,29,27,30],"3","招标人可以对已发出的招标文件进行必要的澄清或者修改.澄清或者修改的内容可能影响投标文件编制的,招标人应当在投标截止时间至少( )日前,以书面形式通知所有获取招标文件的潜在投标人",{"answer":105,"createTime":45,"id":106,"options":107,"question":112,"source":32,"type":33},[],175760912,[108,109,110,111],"执行后","上一年","执行初期","当年","政府采购预算的编制时间是在项目执行的",1]