[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fGIObvbaZEafj04iY37VPwTMoiUNYgS4VRvPbeNDNUeM":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":19,"related":20,"source":31,"type":84},[],"2025-01-08 22:08:03",176992718,[8,9,10,11],"业主承担工程价格波动的风险,承包商承担工程量变动的风险","业主承担工程量变动风险,承包商承担工程价格波动的风险","业主承担工程量变动和工程价格波动的风险","承包商承担工程量变动和工程价格波动的风险",{"count":13,"courseId":14,"courseImg":15,"courseName":16,"workId":17,"workName":18},25,"b96d9f834b91b76e6e9ef09ccacc3f3d","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F962e041dd08b1238bcb62acbfeb9ca5f.jpg","建筑工程计价与投资控制","03e6046956aa4c4c87f4a189d395adbd","4.4 工程量清单计价","实行工程量清单计价,()",[21,33,43,53,63,75,85,94,103,106],{"answer":22,"createTime":5,"id":23,"options":24,"question":30,"source":31,"type":32},[],176992710,[25,26,27,28,29],"项目编码第7-9位为分项工程项目名称顺序码","项目名称应按工程量计算规范附录中给定的名称确定","项目特征应按工程量计算规范附录中规定的项目特征予以描述","计量单位应按工程量计算规范附录中给定的,选用最适宜表现项目特征并方便计量的单位","工程量应按实际完成的工程量计算","关于分部分项目工程清单的编制,下列说法正确的有( )","v1",1,{"answer":34,"createTime":5,"id":35,"options":36,"question":42,"source":31,"type":32},[],176992711,[37,38,39,40,41],"以清单计算规范附录中的名称为基础,结合具体工作内容补充细化项目名称","清单项目的工作内容在招标工程量清单的项目特征中加以描述","有两个或以上计量单位时,选择最适宜表现项目特征并方便计算的单位","除另有说明外,清单项目的工程量应以实体工程量为准,各种施工中的损耗和需要增加的工程量应在单价中考虑","在工程量清单中应附补充项目的项目名称、项目特征、计量单位和工程量","关于分部分项工程量清单的编制,下列说法中正确的有( )",{"answer":44,"createTime":5,"id":45,"options":46,"question":52,"source":31,"type":32},[],176992712,[47,48,49,50,51],"机械设备暂估价","单位工程暂估价","材料暂估价","工程设备暂估价","专业工程暂估价","暂估价主要包括( )",{"answer":54,"createTime":5,"id":55,"options":56,"question":62,"source":31,"type":32},[],176992713,[57,58,59,60,61],"项目特点","项目特征","计量单位","计算单位","工程量","分部分项工程项目清单的5个要件包括项目编码、项目名称和( )",{"answer":64,"createTime":5,"id":65,"options":66,"question":74,"source":31,"type":32},[],176992714,[67,68,69,70,71,72,73],"招标文件中的工程量清单标明的工程量是招标人编制招标控制价和投标人投标报价的共同基础","清单工程量是按施工图图示尺寸和工程量清单计算规则计算得到的工程净量","定额子目工程量应严格按照与所釆用的定额相对应的工程量计算规则计算","一个清单项目对应一个定额子目时,清单工程量和定额工程量很可能不同","《计价规范》中的工程量清单综合单价包括人工费、材料费、施工机具使用费和企业管理费与利润,以及一定范围内的风险费用","一个清单项目可能对应多个定额子目","清单工程量不能直接用于计价,应根据所采用的计价定额及相应的工程量计算规则重新计算各定额子目的施工工程量","工程量清单计价模式下,关于分部(分项)工程量的确定及综合单价编制的说法,正确的有( )",{"answer":76,"createTime":5,"id":77,"options":78,"question":83,"source":31,"type":84},[],176992715,[79,80,81,82],"宜","必须","可以","不得","使用国有资金投资的建设工程发承包,( )采用工程量清单计价",0,{"answer":86,"createTime":5,"id":87,"options":88,"question":93,"source":31,"type":84},[],176992716,[89,90,91,92],"招标人","投标人","招标代理机构","招标监督机构","招标工程量清单必须作为招标文件的组成部分,其准确性和完整性应由( )负责",{"answer":95,"createTime":5,"id":96,"options":97,"question":102,"source":31,"type":84},[],176992717,[98,99,100,101],"工程量清单是包括工程数量的明细清单","工程量清单也包括工程数量相应的单价","工程量清单由招标人提供","工程量清单是招标文件的组成部分","对工程量清单概念表述不正确的是( )",{"answer":104,"createTime":5,"id":6,"options":105,"question":19,"source":31,"type":84},[],[8,9,10,11],{"answer":107,"createTime":108,"id":109,"options":110,"question":115,"source":31,"type":84},[],"2025-01-08 22:08:04",176992719,[111,112,113,114],"将管理费分开","将利润分开","将实物和费用分开","将工程实体与非工程实体分开","工程量清单计价模式是( )"]