[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fG1SjuQ-d30AOYslVy8h7If5YCCi-4kHfcyzsheM27yc":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":19,"related":20,"source":30,"type":31},[],"2025-05-23 10:36:46",190184275,[8,9,10,11],"MIDAS软件","PERFORM-3D软件","INFOWORKS软件","ROBOT软件",{"count":13,"courseId":14,"courseImg":15,"courseName":16,"workId":17,"workName":18},134,"e67c9d38a06155938c04ae8f67cc7112","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F84428270f75c9b1a9fb7af8470eedb1c.png","BIM建模与参数化技术应用（2025春季）","work_43805919","作业3","以下选项中不能用于结构分析的软件是?()",[21,32,41,50,59,68,71,80,89,98],{"answer":22,"createTime":5,"id":23,"options":24,"question":29,"source":30,"type":31},[],190184270,[25,26,27,28],"建立模型维护与应用机制","确定模型应用计划","实施全过程规划","确定BIM实施目标","督促各分包在施工过程中维护和应用BIM模型,按要求及时更新和深化BIM 模型,并提交相应的BIM应用成果体现的是( )","v1",0,{"answer":33,"createTime":5,"id":34,"options":35,"question":40,"source":30,"type":31},[],190184271,[36,37,38,39],"建立系统运行保障体系","建立系统运行工作目标","建立BIM实施应用标准","建立BIM工作计划","主要包括组建系统人员配置保障体系、编制BIM系统运行工作计划、建立系统运行例会制度和建立系统运行检查机制等方面",{"answer":42,"createTime":5,"id":43,"options":44,"question":49,"source":30,"type":31},[],190184272,[45,46,47,48],"对象样式","视图样板","楼层可见性图形替换","视图专有图元替换","对象样式、视图样板、楼层可见性图形替换、视图专有图元替换中定义的图元线形样式,其中优先级最高的为()",{"answer":51,"createTime":5,"id":52,"options":53,"question":58,"source":30,"type":31},[],190184273,[54,55,56,57],"BIM建模软件、BIM协同软件","BIM软件平台、BIM工具软件、BIM环境软件","BIM三维模型软件、BIM施工软件","BIM设计软件、BIM运维软件","下列按照BIM应用软件按照其功能不同分类正确的是()",{"answer":60,"createTime":5,"id":61,"options":62,"question":67,"source":30,"type":31},[],190184274,[63,64,65,66],"BIM实施目标","BIM实施技术路线","BIM实施应用计划","BIM实施资源配置","是指对要达到项目目标准备采取的技术手段、具体步骤及解决关键性问题的方法等在内的研究途径",{"answer":69,"createTime":5,"id":6,"options":70,"question":19,"source":30,"type":31},[],[8,9,10,11],{"answer":72,"createTime":5,"id":73,"options":74,"question":79,"source":30,"type":31},[],190184276,[75,76,77,78],"硬件","软件","工作环境","时间工期","在确定技术路线的过程中根据BIM应用的主要业务目标和项目、团队、企业的实际情况来选择&quot;合适&quot;的( )从而完成相应的BIM应用内容",{"answer":81,"createTime":5,"id":82,"options":83,"question":88,"source":30,"type":31},[],190184277,[84,85,86,87],"方案阶段","初设阶段","竣工图阶段","深化阶段","钢结构的节点设计属于哪个阶段()",{"answer":90,"createTime":5,"id":91,"options":92,"question":97,"source":30,"type":31},[],190184278,[93,94,95,96],"到2022年末,建筑行业甲级勘查、设计单位应掌握并实现BIM与企业管理系统和其他信息技术的一体化集成应用","到2020年末,新立项的以国有资金投资为主的大中型建筑、申报绿色建筑的公共建筑和绿色生态示范小区在勘查设计、施工、运营维护中,集成应用BIM的项目比率达到90%","到2018年末,建筑行业特级、一级房屋建筑工程施工企业应掌握并实现BIM与企业管理系统和其他信息技术的一体化集成应用","到2018年末,新立项的以国有资金投资为主的大中型建筑、申报绿色建筑的公共建筑和绿色生态示范小区在勘查设计、施工、运营维护中,集成应用BIM的项目比率达到90%","以下表述中,符合《关于推进建筑信息模型应用的指导意见》中发展目标要求的是()",{"answer":99,"createTime":5,"id":100,"options":101,"question":106,"source":30,"type":31},[],190184279,[102,103,104,105],"项目目标","公司目标","地方目标","行业目标","缩短工期、降低工程造价、提升工程质量是属于( )"]