[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fhKgIWzFkWZlYTIl16Q8k9FBP6FP7As3JPYBIwO0FY00":3},{"id":4,"source":5,"question":6,"options":7,"answer":12,"related":13,"type":115,"origin":116,"createTime":123},204681072,"v1","下列属于装饰灯的有",[8,9,10,11],"歌舞厅灯具","草坪灯具","标志灯","诱导装饰灯",[],[14,27,38,48,59,69,79,89,96,106],{"id":15,"source":5,"question":16,"options":17,"answer":22,"related":23,"type":24,"origin":25,"createTime":26},204680422,"工程量清单的编制者是( )",[18,19,20,21],"建设行政主管部门","招标人","投标人","工程造价咨询机构",[],[],0,null,"2025-06-19T16:42:39+08:00",{"id":28,"source":5,"question":29,"options":30,"answer":35,"related":36,"type":24,"origin":25,"createTime":37},204680430,"从性质上说,工程量清单是( )的组成部分",[31,32,33,34],"招标文件","施工设计图纸","投标文件","可行性研究报告",[],[],"2025-06-19T16:42:40+08:00",{"id":39,"source":5,"question":40,"options":41,"answer":46,"related":47,"type":24,"origin":25,"createTime":37},204680431,"根据《建设工程工程量清单计价规范》(GB50500-2013)中的规定,工程量清单项目编码的第四级表示( )",[42,43,44,45],"分类码","章顺序码","节顺序码","分部分项工程顺序码",[],[],{"id":49,"source":5,"question":50,"options":51,"answer":56,"related":57,"type":24,"origin":25,"createTime":58},204680438,"工程量清单是招标文件的组成部分,其组成不包括( )",[52,53,54,55],"分部分项工程量清单","措施项目清单","其他项目清单","直接工程费清单",[],[],"2025-06-19T16:42:41+08:00",{"id":60,"source":5,"question":61,"options":62,"answer":67,"related":68,"type":24,"origin":25,"createTime":58},204680443,"定额中规定的时间不包括( )",[63,64,65,66],"休息时间","施工本身造成的停工时间","辅助工作时间","不可避免的中断事件",[],[],{"id":70,"source":5,"question":71,"options":72,"answer":77,"related":78,"type":24,"origin":25,"createTime":58},204680452,"暂估价是招标人在工程量清单中提供的用于支付( )的材料、工程设备的单价以及专业工程的金额",[73,74,75,76],"必然发生,但暂时不能确定价格","可能发生,但暂时不能确定价格","可能发生,也可能不发生的价格","以上说法都不对",[],[],{"id":80,"source":5,"question":81,"options":82,"answer":87,"related":88,"type":24,"origin":25,"createTime":58},204680461,"工程数量的计量单位应按规定采用法定单位或自然单位,并遵守有效位数的规定.以质量计算的项目为t或Kg,应保留小数点后( )位数字",[83,84,85,86],"1","2","3","4",[],[],{"id":90,"source":5,"question":91,"options":92,"answer":93,"related":94,"type":24,"origin":25,"createTime":95},204680470,"工程数量的计量单位应按规定采用法定单位或自然单位,并遵守有效位数的规定.以长度、面积、体积计算的项目,其工程量应保留小数点后( )位数字",[83,84,85,86],[],[],"2025-06-19T16:42:42+08:00",{"id":97,"source":5,"question":98,"options":99,"answer":104,"related":105,"type":24,"origin":25,"createTime":95},204680477,"工程数量的计量单位应按规定采用法定单位或自然单位,并遵守有效位数的规定.以自然计量单位计算的项目和没有具体数量的项目,其工程量应( )",[100,101,102,103],"保留1位小数","保留2位小数","保留3位小数","取整数",[],[],{"id":107,"source":5,"question":108,"options":109,"answer":113,"related":114,"type":24,"origin":25,"createTime":95},204680485,"山东省安装工程消耗量定额(SD02-31-2016)规定,关于室内外给水管道界限划分,下列说法最准确的是( )",[110,111,112,76],"室内外给水管道以建筑物外墙皮1.5米为界","建筑物入口处设阀门者以阀门为界","室内外给水管道已建筑物外墙皮1.5米为界,建筑物入口处设阀门者以阀门为界",[],[],1,{"courseName":117,"courseImg":118,"workName":119,"workId":120,"count":121,"courseId":122},"默认课程","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F03a579384a6dc297c89809b582fcc767.png","安装工程计量与计价复习作业","work_44189089",199,"53e1d2ef4961cca8eea3e23969ad2cb9","2025-06-19T16:43:04+08:00"]