[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fe-vc5hY3vmKaMQkEk0d2wV1i3v73g2i1v37dbE3fe28":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":19,"related":20,"source":30,"type":31},[],"2025-06-26 14:02:01",208450512,[8,9,10,11],"重叠","随意","错开","对准",{"count":13,"courseId":14,"courseImg":15,"courseName":16,"workId":17,"workName":18},80,"09f344f8fce65404cd3158b0ba982900","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F48eba3395437dd881b1b9275a0ad1028.png","建筑工程质量与安全管理","exam_159924161","《建筑工程质量与安全管理》综合能力测试(5)-副本","现浇混凝土结构多层连续支模时,上下层模板支架的竖杆应如何设置",[21,32,41,50,59,62,71,80,89,98],{"answer":22,"createTime":5,"id":23,"options":24,"question":29,"source":30,"type":31},[],208450504,[25,26,27,28],"8%","15%","12%","10%","软包工程中,木材含水率不得大于","v1",0,{"answer":33,"createTime":5,"id":34,"options":35,"question":40,"source":30,"type":31},[],208450506,[36,37,38,39],"300mm","250mm","200mm","150mm","屋面出入口的泛水高度不应小于( )",{"answer":42,"createTime":5,"id":43,"options":44,"question":49,"source":30,"type":31},[],208450508,[45,46,47,48],"&plusmn;100mm","&plusmn;150mm","&plusmn;50mm","&plusmn;200mm","湿陷性黄土场地上的素土、灰土地基质量检验和验收时,外放尺寸和垫层总厚度应进行检验,外放尺寸的允许偏差是多少",{"answer":51,"createTime":5,"id":52,"options":53,"question":58,"source":30,"type":31},[],208450510,[54,55,56,57],"4h","2h","3h","5h","现场拌制的砂浆应随拌随用,拌制的砂浆应在( )内使用完毕;当施工期间最高气温超过 30℃时,应在 2h 内使用完毕",{"answer":60,"createTime":5,"id":6,"options":61,"question":19,"source":30,"type":31},[],[8,9,10,11],{"answer":63,"createTime":5,"id":64,"options":65,"question":70,"source":30,"type":31},[],208450513,[66,67,68,69],"四级","两级","三级","五级","基坑支护结构的安全等级分为( )",{"answer":72,"createTime":5,"id":73,"options":74,"question":79,"source":30,"type":31},[],208450514,[75,76,77,78],"发电机功率应满足施工用电需求","发电机房应封闭并设置通风设施","发电机需设置接地装置","发电机可与临时宿舍相邻设置","下列关于施工现场发电机的说法,错误的是( )",{"answer":81,"createTime":5,"id":82,"options":83,"question":88,"source":30,"type":31},[],208450515,[84,85,86,87],"200t","300t","400t","500t","当水泥、外加剂满足特定条件,检验批容量扩大一倍后,对于连续进场的同一厂家、同一品种、同一规格的水泥,袋装( )为一批",{"answer":90,"createTime":5,"id":91,"options":92,"question":97,"source":30,"type":31},[],208450516,[93,94,95,96],"由监理单位决定是否验收","予以验收","直接验收","不予验收","当建筑工程施工质量不符合要求时,经有资质的检测机构检测鉴定达不到设计要求、但经原设计单位核算认可能够满足安全和使用功能的检验批应如何处理",{"answer":99,"createTime":5,"id":100,"options":101,"question":106,"source":30,"type":31},[],208450517,[102,103,104,105],"完整的施工图设计文件","施工进度计划","施工预算","材料供应商名单","根据《GB50210-2018》,建筑装饰装修工程的设计文件必须包含以下哪项内容"]