[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fCfezad56T0Y2kbhxN7i6T1ouE3sTyLbSQpEZfNeV1b4":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":19,"related":20,"source":30,"type":31},[],"2025-10-04 12:48:54",219520422,[8,9,10,11],"3","10","20","30",{"count":13,"courseId":14,"courseImg":15,"courseName":16,"workId":17,"workName":18},78,"53e1d2ef4961cca8eea3e23969ad2cb9","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F03a579384a6dc297c89809b582fcc767.png","默认课程","exam_167867801","建筑工程监理概论课程作业2","《生产安全事故报告和调查处理条例》规定:特别重大事故,是指造成( )人以上死亡,或者100人以上重伤(包括急性工业中毒,下同),或者1亿元以上直接经济损失的事故",[21,32,41,50,59,68,77,80,89,98],{"answer":22,"createTime":5,"id":23,"options":24,"question":29,"source":30,"type":31},[],219520410,[25,26,27,28],"组织措施","技术措施","经济措施","合同措施","落实投资控制、质量控制、进度控制的部门和人员,确定控制部门和人员的任务、工作和管理职能分工,制定目标控制的工作流程等工作属于目标控制综合措施中( )的范畴","v1",0,{"answer":33,"createTime":5,"id":34,"options":35,"question":40,"source":30,"type":31},[],219520412,[36,37,38,39],"施工单位负责人","施工项目负责人","项目技术负责人","总监理工程师","对建设工程项目的安全施工负责",{"answer":42,"createTime":5,"id":43,"options":44,"question":49,"source":30,"type":31},[],219520414,[45,46,47,48],"对立","统一","既对立又统一","既不对立又不统一","如果工程项目进度计划制定得既可行又优化,则可以使工期缩短,且可能获得较好的质量和较低的费用.这表明,工程项目投资、进度、质量三大目标之间存在( )的关系",{"answer":51,"createTime":5,"id":52,"options":53,"question":58,"source":30,"type":31},[],219520416,[54,55,56,57],"合同方","监理与被监理","管理与被管理","商业性服务","监理单位与承包单位是( )关系",{"answer":60,"createTime":5,"id":61,"options":62,"question":67,"source":30,"type":31},[],219520418,[63,64,65,66],"b-c-a-f-g-d-e","a-b-c-d-e-f-g","d-a-c-e-b-f-g","d-a-c-e-b-g-f","建设工程监理实施的步骤有:a编制监理规划b参与验收,签署监理意见c编制监理实施细则d任命总监成立项目监理机构e开展监理工作f向建设单位提交监理档案资料g监理工作总结.其正确顺序为( )",{"answer":69,"createTime":5,"id":70,"options":71,"question":76,"source":30,"type":31},[],219520420,[72,73,74,75],"目标","程序","制度","方法","监理规划的内容中,监理工作( )应当最先确定",{"answer":78,"createTime":5,"id":6,"options":79,"question":19,"source":30,"type":31},[],[8,9,10,11],{"answer":81,"createTime":5,"id":82,"options":83,"question":88,"source":30,"type":31},[],219520424,[84,85,86,87],"人为因素","技术因素","设备与构配件因素","水文地质与气象因素","影响建设工程项目进度最大的干扰因素是( )",{"answer":90,"createTime":5,"id":91,"options":92,"question":97,"source":30,"type":31},[],219520426,[93,94,95,96],"可以验收","应重新进行验收","应予验收","严禁验收","通过返修或加固后处理仍不能满足安全使用要求的分部工程、单位(子单位)工程( )",{"answer":99,"createTime":5,"id":100,"options":101,"question":106,"source":30,"type":31},[],219520428,[102,103,104,105],"投资估算是进行技术设计和施工图设计的投资控制目标","施工图预算或建安工程承包合同价则是施工阶段投资控制目标","各阶段投资控制目标是有机联系、相互制约、相互补充的","合理的投资控制目标要有科学的依据和实现的可能性","下列各项关于投资控制目标说法不正确的一项是( )"]