[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fyLG6K-zAutc1quHlD9J4dzHuY3l-itTneGm3RJAKMrU":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":13,"question":20,"related":21,"source":31,"type":32},[],"2025-10-28 23:36:33",225369993,[8,9,10,11,12],"建设前期环境保护审查、审批手续完备,技术资料与环境保护档案资料齐全","环境保护设施及其他措施等已按批准的环境影响评价文件和设计文件的要求建成或者落实,环境保护设施经负荷试车检测合格,其防治污染能力适应主体工程的需要","污染物排放符合环境影响评价文件和设计文件中提出的标准及核定的污染物排放总量控制指标的要求","环境影响报告书(表)要求建设单位采取措施削减其他设施污染物排放,或要求建设项目所在地地方政府或者有关部门采取&quot;区域削减&quot;措施满足污染物排放总量控制要求的,其相应措施得到落实","环境影响报告书要求建设单位按照环境影响评价法的规定开展公众参与,建设单位按照法律要求落实的",{"count":14,"courseId":15,"courseImg":16,"courseName":17,"workId":18,"workName":19},13,"53e1d2ef4961cca8eea3e23969ad2cb9","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F03a579384a6dc297c89809b582fcc767.png","默认课程","work_45512764","模块二 环境影响评价程序与方法","建设项目竣工环境保护验收条件包括下列哪些内容?( )",[22,33,36,45,54,63,73,83,92,101],{"answer":23,"createTime":5,"id":24,"options":25,"question":30,"source":31,"type":32},[],225369992,[26,27,28,29],"建设项目的环境影响评价文件自批准之日起超过五年,方决定该项目开工建设,应当重新报批","建设项目名称变化,应当重新报批","建设项目防治污染、防止生态破坏的措施发生重大变动的,应当重新报批","采用的生产工艺发生重大变化,应当重新报批","对建设项目环境影响评价文件的重新报批说法正确的是( )","v1",1,{"answer":34,"createTime":5,"id":6,"options":35,"question":20,"source":31,"type":32},[],[8,9,10,11,12],{"answer":37,"createTime":5,"id":38,"options":39,"question":44,"source":31,"type":32},[],225369994,[40,41,42,43],"清单法","矩阵法","叠图法","物理模型","环境影响识别方法有( )",{"answer":46,"createTime":5,"id":47,"options":48,"question":53,"source":31,"type":32},[],225369995,[49,50,51,52],"环境保护验收","环境影响技术评估","环境影响后评价","环境影响评价","根据《环境影响评价工程师职业资格制度暂行规定》,环境影响评价工程师可主持进行( )工作",{"answer":55,"createTime":5,"id":56,"options":57,"question":62,"source":31,"type":32},[],225369996,[58,59,60,61],"研究有关文件","进行初步的工程分析和环境现状调查","筛选重点评价项目,确定各单项环境影响评价的工作等级","确定环境保护目标","环境影响评价工作程序中的准备阶段主要完成的内容是( )",{"answer":64,"createTime":5,"id":65,"options":66,"question":71,"source":31,"type":72},[],225369997,[67,68,69,70],"重新编制环境影响评价文件","其环境影响评价文件报原审批部门重新审核","其环境影响评价文件报原审批部门上级单位审核","可直接开工","建设项目环境影响评价文件自批准之日起满5年,方决定该项目开工建设的,应当( )",0,{"answer":74,"createTime":5,"id":75,"options":76,"question":82,"source":31,"type":72},[],225369998,[77,78,79,80,81],"建设项目的工程分析","筛选重点评价项目","审查环境影响报告书","环境现状调查","评价项目的经济可行性","环境影响评价工作程序中不包括的工作环节是( )",{"answer":84,"createTime":5,"id":85,"options":86,"question":91,"source":31,"type":72},[],225369999,[87,88,89,90],"由国务院生态环境行政主管部门认定","由省级环保行政主管部门确定","按不同行业评价类别分别确定","按其中单项等级最高的确定","依据《建设项目环境评价分类管理名录》,跨行业、符合复合型建设项目的环境影响评价类别确定的方法是( ). &rlm;",{"answer":93,"createTime":5,"id":94,"options":95,"question":100,"source":31,"type":72},[],225370000,[96,97,98,99],"建设项目环境影响后评价应当在建设项目试生产后三至五年内开展","建设项目环境影响后评价应当在建设项目开工建设后三至五年内开展","建设项目环境影响后评价应当在建设项目正式投入生产后三至五年内开展","当地环境保护主管部门可以根据建设项目的环境影响和环境要素变化特征,确定开展环境影响后评价的时限","根据《建设项目环境影响评价后评价管理办法(试行)》,下列关于建设项目环境影响后评价时限要求的说法中,正确的是( )",{"answer":102,"createTime":5,"id":103,"options":104,"question":109,"source":31,"type":72},[],225370002,[105,106,107,108],"25.0%","28.6%","33.3%","50.0%","某监测点总监测数据为80个,其中超标监测数据20个,不符合监测技术规范要求的监测数据10个,未检出的点位数为10个,则超标率是( )"]