[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fz4VD7IN4L2MgjIgzP_L2B3EEi_nti-iAf5zUFFvJNmg":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":19,"related":20,"source":30,"type":31},[],"2025-11-20 22:15:30",238036751,[8,9,10,11],"12","8","15","10",{"count":13,"courseId":14,"courseImg":15,"courseName":16,"workId":17,"workName":18},185,"53e1d2ef4961cca8eea3e23969ad2cb9","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F03a579384a6dc297c89809b582fcc767.png","默认课程","exam_167806665","建工学院23级学生顶岗实习安全教育测试","高处安装中的电、气焊作业,应严格采取安全防火措施,在作业处下面周围( )m范围内不得有人",[21,32,41,44,53,62,71,80,89,98],{"answer":22,"createTime":5,"id":23,"options":24,"question":29,"source":30,"type":31},[],238036749,[25,26,27,28],"1","4","3","2","木工机械距闸箱水平距离不得大于( )m,以便发生故障时,迅速切断电源","v1",0,{"answer":33,"createTime":5,"id":34,"options":35,"question":40,"source":30,"type":31},[],238036750,[36,37,38,39],"电工工长","技术负责人","电气工程技术人员","电工","临时用电施工组织设计必须由( )编制,技术负责人审核,并经主管部门批准后实施,临时用电工程图纸必须单独绘制,并作为临时用电施工的依据",{"answer":42,"createTime":5,"id":6,"options":43,"question":19,"source":30,"type":31},[],[8,9,10,11],{"answer":45,"createTime":5,"id":46,"options":47,"question":52,"source":30,"type":31},[],238036752,[48,49,50,51],"玻璃钢制品","塑料品","电气装置","木制品","燃烧的火灾不能用水扑救",{"answer":54,"createTime":5,"id":55,"options":56,"question":61,"source":30,"type":31},[],238036753,[57,58,59,60],"绿\u002F黄双色","黄色","绿色","淡蓝色个","施工现场用电系统中,PE线的绝缘色应是( )",{"answer":63,"createTime":5,"id":64,"options":65,"question":70,"source":30,"type":31},[],238036754,[66,67,68,69],"3m,15m","5m,8m","3m,10m","5m,10m","现场实施气焊或气割作业时,乙炔瓶与氧气瓶之间的距离不得少于(D),与明火之间的距离不得少于( )",{"answer":72,"createTime":5,"id":73,"options":74,"question":79,"source":30,"type":31},[],238036755,[75,76,77,78],"18m","20m","10m","12m","扣件式钢管脚手架施工层以下每隔( )应用水平安全网封闭",{"answer":81,"createTime":5,"id":82,"options":83,"question":88,"source":30,"type":31},[],238036756,[84,85,86,87],"内侧","两边","随意","外侧","变配电室搭设必须采用防火材料,门必须朝向( )开启",{"answer":90,"createTime":5,"id":91,"options":92,"question":97,"source":30,"type":31},[],238036757,[93,94,95,96],"一般","应该","建议","必须","建筑拆除工程( )由具备爆破与拆除专业承包资质的单位施工,严禁将工程整体转包",{"answer":99,"createTime":5,"id":100,"options":101,"question":106,"source":30,"type":31},[],238036758,[102,103,104,105],"1.5m","3m","2m","1m","推土机在深沟、基坑或陡坡地区作业时,其垂直边坡深度一般不超过( ),否则应放出安全边坡"]