[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$flB4kUwRkX9x2F-6mlt_44Ckw3gh2KU8i1ekkzUttlmw":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":19,"related":20,"source":30,"type":31},[],"2025-11-24 22:44:34",241013481,[8,9,10,11],"综合单价法","参数法计价","分包法计价","总包法计价",{"count":13,"courseId":14,"courseImg":15,"courseName":16,"workId":17,"workName":18},75,"53e1d2ef4961cca8eea3e23969ad2cb9","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F03a579384a6dc297c89809b582fcc767.png","默认课程","work_46050538","无损检测基础知识和法律法规中级","6) 在措施项目费中,根据需要消耗的实物工程量与实物单价计算措施费的方法是( )☆",[21,32,41,50,59,68,77,86,89,98],{"answer":22,"createTime":5,"id":23,"options":24,"question":29,"source":30,"type":31},[],241013474,[25,26,27,28],"组织措施","管理措施","经济措施","技术措施","3) 建设工程中,控制项目目标最重要的措施是( ) ☆☆","v1",0,{"answer":33,"createTime":5,"id":34,"options":35,"question":40,"source":30,"type":31},[],241013475,[36,37,38,39],"省级以上","市级以上","县级以上","乡级以上","国务院和( )地方市场监督管理部&quot;组织产品质量的监督抽查工作.☆",{"answer":42,"createTime":5,"id":43,"options":44,"question":49,"source":30,"type":31},[],241013476,[45,46,47,48],"有权要求将增加的费用加到合同总价中","无权要求将增加的费用加到合同总价中","增加的费用需通过业主的审核后才能加到合同总价中","可以与业主协商解决费用增加的补偿问题","26) 某工程以固定总价合同形式发包给承包商.在夏季施工中雨天较往年多,施工中产生的费用较投标时预计的高,为此承包商( )☆☆☆",{"answer":51,"createTime":5,"id":52,"options":53,"question":58,"source":30,"type":31},[],241013477,[54,55,56,57],"论证施工总进度目标","确定施工作业的具体安排","确定里程碑事件的进度目标","分解施工总进度目标B、存在多余节点13) 如下所示的网络图中,存在的绘图错误是( C )☆☆\u003Cimg src=\"https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F67cccf2ddca5a81fc042c732f08588d5.jpg\">A、点编号错误","12) 编制实施性施工进度计划的主要作用是( )☆",{"answer":60,"createTime":5,"id":61,"options":62,"question":67,"source":30,"type":31},[],241013478,[63,64,65,66],"建设主管部门","合同文件","城建档案管理机构","文档整理规范","30) 施工单位在收齐工程文件整理立卷后,建设单位、监理单位应对档案文件完整、准确、系统情况和案卷质量进行审查.审查应按照( )的要求进行.☆",{"answer":69,"createTime":5,"id":70,"options":71,"question":76,"source":30,"type":31},[],241013479,[72,73,74,75],"工程进度控制与工程质量、成本无关","赶工会导致工程质量和安全问题出现,但会降低工程成本","缩短工期要以确保工程质量、安全为前提","只要赶工所增加的成本可以承受,就应尽量缩短工期","10) 下列关于工程进度、质量、成本安全之间的关系及其管理工作的说法中,正确的是( )☆",{"answer":78,"createTime":5,"id":79,"options":80,"question":85,"source":30,"type":31},[],241013480,[81,82,83,84],"综合应急预案、单项应急预案、点应急预案","企业应急预案、项目应急预案、人员应急预案","企业应急预案、职能部门应急预案、项目应急预案","综合应急预案、专项应急预案、现场处置方案","22) 施工生产安全事故应急预案体系由( )构成.☆",{"answer":87,"createTime":5,"id":6,"options":88,"question":19,"source":30,"type":31},[],[8,9,10,11],{"answer":90,"createTime":5,"id":91,"options":92,"question":97,"source":30,"type":31},[],241013482,[93,94,95,96],"①实施与运行-②检查和纠正措施-③策划-④管理评审","①实施与运行-②管理评审-③策划-④检查和纠正措施","①策划-②实施与运行-③检查和纠正措施-④管理评审","①策划-②实施与运行-③管理评审-④检查和纠正措施","20) \u003Cimg src=\"https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002Fde4e5cab5889ca8360150e97d6761be8.jpg\">职业健康安全管理体系标准的结构系统,采用PDCA动态循环管理模式,不断上升的螺旋式运行模式.如图所示,下列序号表示正确的是( ) ☆☆",{"answer":99,"createTime":5,"id":100,"options":101,"question":106,"source":30,"type":31},[],241013483,[102,103,104,105],"人工定额","材料消耗定额","施工机械台班使用定额","施工定额","5) 建设工程定额是工程建设中各类定额的总称,下列属于按编制程序和用途分类的定额是( )☆"]