[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fhzenPqo3ZYyf5GryuSPE8LHhbkW6iVvQRCkKVDQqSJU":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":19,"related":20,"source":24,"type":25},[],"2025-12-05 10:08:29",251335599,[8,9,10,11],"应按看台结构顶板的投影面积计算","应按看台结构底板水平投影面积计算","应按看台结构顶板投影面积的1\u002F2计算","应按看台结构底板水平投影面积的1\u002F2计算",{"count":13,"courseId":14,"courseImg":15,"courseName":16,"workId":17,"workName":18},50,"53e1d2ef4961cca8eea3e23969ad2cb9","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F03a579384a6dc297c89809b582fcc767.png","默认课程","exam_167701476","建筑工程计量与计价(路桥方向)","室内单独设置的有维护设施的悬挑看台,应该按什么计算()",[21,26,35,44,53,62,71,80,89,98],{"answer":22,"createTime":5,"id":6,"options":23,"question":19,"source":24,"type":25},[],[8,9,10,11],"v1",0,{"answer":27,"createTime":5,"id":28,"options":29,"question":34,"source":24,"type":25},[],251335603,[30,31,32,33],"成孔深度","孔深&mdash;桩长(不包括桩尖)","孔深&mdash;桩长(含桩尖)","桩长(不含桩尖)","桩顶标高在实际地面标高以下,泥浆护壁成孔灌注桩项目特征中需描绘空桩长度,此处的空桩长度是指()",{"answer":36,"createTime":5,"id":37,"options":38,"question":43,"source":24,"type":25},[],251335605,[39,40,41,42],"平方米","立方米","平方厘米","厘米","混凝土板工程量按图示面积乘以板厚以()",{"answer":45,"createTime":5,"id":46,"options":47,"question":52,"source":24,"type":25},[],251335606,[48,49,50,51],"基本工作时间","不可避免的中断时间","不是故意的失误时间","准备结束时间","劳动定额时间不包括()",{"answer":54,"createTime":5,"id":55,"options":56,"question":61,"source":24,"type":25},[],251335609,[57,58,59,60],"根","个","榀","樘","送风口、回风口的计量单位是()",{"answer":63,"createTime":5,"id":64,"options":65,"question":70,"source":24,"type":25},[],251335611,[66,67,68,69],"其他项目清单","单位工程量清单","综合单价清单","零星项目清单","工程量清单内容包括分部分项工程量清单,措施项目清单和()",{"answer":72,"createTime":5,"id":73,"options":74,"question":79,"source":24,"type":25},[],251335614,[75,76,77,78],"垂直投影面积米","垂直投影面积平方米","水平投影面积米","水平投影面积平方米","外墙抹灰面积,按设计外墙抹灰的()以()计算",{"answer":81,"createTime":5,"id":82,"options":83,"question":88,"source":24,"type":25},[],251335616,[84,85,86,87],"预制钢筋混凝土管桩试验桩应在工程量清单中单独列项","预制钢筋混凝土方桩试验桩工程量应并入预制钢筋混凝土方桩项目","现场截凿桩头工程量不单独列项,并入桩工程量计算","挖孔桩土方按设计桩长(包括桩尖)以米计算","根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)规定,关于桩基础的项目列项或工程量计算正确的为()",{"answer":90,"createTime":5,"id":91,"options":92,"question":97,"source":24,"type":25},[],251335617,[93,94,95,96],"L&times;基础断面面积-嵌入基础的构件体积","基础高度&times;基础墙厚+大放脚折加面积","(基础高度+大放脚折加高度)&times;基础墙厚","大放脚折加面积&divide;基础墙厚","在砌筑基础工程量计算中,条形基础的基础工程量计算规则是()",{"answer":99,"createTime":5,"id":100,"options":101,"question":106,"source":24,"type":25},[],251335619,[102,103,104,105],"门窗洞口","单个面积小于0.3㎡的孔洞","空圈","过人洞","计算墙体时,以下不应扣除的是()"]