[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fmuVZfX9iLBiKQt-oAoe_ig1LVw6iT61B5doh7oS6r7g":3},{"id":4,"source":5,"question":6,"options":7,"answer":13,"related":14,"type":68,"origin":111,"createTime":27},269590205,"v1","关于土石方开挖,说法正确的有( )",[8,9,10,11,12],"土石方开挖在需要的情况下,可私自改变支护结构位置","基坑边1m范围内不得堆土、堆料、放置机具","基坑工程的检测包括支护结构的检测和周围环境的检测,应采用仪器检测与巡视检查相结合的方法","开挖深度超过2m的基坑周边必须安装防护栏杆,防护栏杆高度不应低于1.8m","当夜间施工时,设置的照明必须充足,灯光布置合理,必要时应配备应急照明",[],[15,28,35,44,54,64,69,80,89,100],{"id":16,"source":5,"question":17,"options":18,"answer":23,"related":24,"type":25,"origin":26,"createTime":27},269590197,"施工期间应保证地下水位经常低于开挖地面( )m以上",[19,20,21,22],"0.5","1","1.5","2",[],[],0,null,"2025-12-17T10:44:57+08:00",{"id":29,"source":5,"question":30,"options":31,"answer":33,"related":34,"type":25,"origin":26,"createTime":27},269590199,"建筑基坑周边( )m内严禁堆土、堆放物料",[20,21,22,32],"2.5",[],[],{"id":36,"source":5,"question":37,"options":38,"answer":42,"related":43,"type":25,"origin":26,"createTime":27},269590200,"下列关于基坑安全防护措施,错误的是( )",[39,40,41,12],"开挖深度超过2m的基坑周边必须安装防护栏杆,防护栏高度不应低于1.2m","可将土石方、料具等荷载较重的物料堆放在基坑周边距基坑边1m范围内","同一垂直作业面的上下层不宜同时作业",[],[],{"id":45,"source":5,"question":46,"options":47,"answer":52,"related":53,"type":25,"origin":26,"createTime":27},269590202,"深基坑工程是指开挖深度超过( )m的基坑(槽)的土方开挖、支护、降水工程",[48,49,50,51],"3","4","5","6",[],[],{"id":55,"source":5,"question":56,"options":57,"answer":62,"related":63,"type":25,"origin":26,"createTime":27},269590204,"安全等级为二级的支护结构,在基坑开挖过程中必须进行支护结构的( )监测",[58,59,60,61],"沉降","水平位移","垂直","倾斜",[],[],{"id":4,"source":5,"question":6,"options":65,"answer":66,"related":67,"type":68,"origin":26,"createTime":27},[8,9,10,11,12],[],[],1,{"id":70,"source":5,"question":71,"options":72,"answer":78,"related":79,"type":68,"origin":26,"createTime":27},269590206,"土方施工必须遵循的原则有( )",[73,74,75,76,77],"开槽支撑","先撑后挖","先挖后撑","严禁超挖","分层开挖",[],[],{"id":81,"source":5,"question":82,"options":83,"answer":87,"related":88,"type":68,"origin":26,"createTime":27},269590207,"下列关于基坑安全防护措施,正确的有( )",[84,40,41,85,86],"当基坑施工深度超过2m时,坑边应按照高处作业的要求设置临边防护,作业人员上下应有专用梯道","多台机械开挖时,挖土机间距应大于9m","软土基坑无可靠措施时应分层均衡开挖,层高不宜超过2m",[],[],{"id":90,"source":5,"question":91,"options":92,"answer":98,"related":99,"type":68,"origin":26,"createTime":27},269590208,"根据开挖难易程度对土质进行分类,以便于( )",[93,94,95,96,97],"确定施工方法","确定地基承载力","计算劳动量","计算工程费用","制定安全措施",[],[],{"id":101,"source":5,"question":102,"options":103,"answer":109,"related":110,"type":68,"origin":26,"createTime":27},269590210,"基坑施工中,常遇到地下水.对地下水的处理,常用的方法包括( )",[104,105,106,107,108],"支护","排水","隔档","降水","隔渗",[],[],{"courseName":112,"courseImg":113,"workName":114,"workId":114,"count":25,"courseId":115},"默认课程","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F03a579384a6dc297c89809b582fcc767.png","","53e1d2ef4961cca8eea3e23969ad2cb9"]