[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fgRZdB8TGX_7QhuKanVM_TUusgE_6kqwT4CyHM92RV30":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":16,"related":17,"source":27,"type":28},[],"2025-12-21 10:23:42",277141604,[8,9,10,11],"由小到大变化","由大到小变化","依次变化","保持不变",{"courseId":13,"courseImg":14,"courseName":15},"53e1d2ef4961cca8eea3e23969ad2cb9","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F03a579384a6dc297c89809b582fcc767.png","默认课程","进行单因素敏感性分析,要假设各个不确定因素之间相互独立,当考查一个因素时,令其余因素( )",[18,29,38,47,50,60,70,80,88,93],{"answer":19,"createTime":5,"id":20,"options":21,"question":26,"source":27,"type":28},[],277141601,[22,23,24,25],"1.76","-1.76","17.6","-17.6","根据下表,计算建设投资变化10%时的敏感度系数为( ).敏感性系数 不确定因素 不确定因素变化率(%) 财务内部收益率 基本方案 15.3% 建设投资变化 10% 12.6% -10% 18.4%","v1",0,{"answer":30,"createTime":5,"id":31,"options":32,"question":37,"source":27,"type":28},[],277141602,[33,34,35,36],"正强","正弱","负强","负弱","敏感因素对项目经济评价指标产生( )敏感性时会给项目带来较大风险",{"answer":39,"createTime":5,"id":40,"options":41,"question":46,"source":27,"type":28},[],277141603,[42,43,44,45],"建设投资","汇率变化","负荷变化","销售价格","某项目敏感性分析得到建设投资、销售价格、原材料价格、汇率变化、负荷变化对于项目投资财务内部收益率的临界点分别为12%,-7.1%,22.4%,32.2%,-11.2%,则最为敏感的因素是( )",{"answer":48,"createTime":5,"id":6,"options":49,"question":16,"source":27,"type":28},[],[8,9,10,11],{"answer":51,"createTime":5,"id":52,"options":53,"question":58,"source":27,"type":59},[],277141605,[54,55,56,57],"单因素敏感性分析是对单一不确定因素变化的影响进行分析,即假设各个不确定性因素之间相互独立,每次只考察一个因素,其他因素保持不变,以分析这个可变因素对经济评价指标的影响程度和敏感程度","分析指标的确定,一般是根据项目的特点、不同的研究阶段、实际需求情况和指标的重要程度来选择,与进行分析的目标和任务有关","由于敏感性分析是与确定性经济分析分别独立进行的,敏感性分析的指标可以与确定性经济评价指标一致,也可以视需要另立新的分析指标","影响项目经济评价指标的不确定性因素很多,但事实上没有必要对所有的不确定因素都进行敏感性分析、敏感性分析的目的在于寻求敏感因素,可以通过计算敏感度系数和临界点来判断","下面关于单因素敏感性分析说法正确的是()",1,{"answer":61,"createTime":5,"id":62,"options":63,"question":69,"source":27,"type":59},[],277141606,[64,65,66,67,68],"减少不确定性对经济效果评价的影响","预测项目承担风险的能力","增加项目的经济效益","确定项目财务上的可靠性","提高投资决策的科学性","对建设项目进行不确定分析的目的是( )",{"answer":71,"createTime":5,"id":72,"options":73,"question":79,"source":27,"type":59},[],277141607,[74,75,76,77,78],"在直线m上净现值等于0","在直线m右上方的区域净现值小于0","第Ⅱ象限所有点净现值大于0","第Ⅲ象限所有点净现值大于0","第Ⅳ象限所有点净现值小于0","在下面双因素敏感性分析图中,分析的评价指标是NPV,影响因素中K表示初始投资,C表示经营成本,则下列说法正确的有( )\u003Cimg src=\"https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F6524b7199c9fd06a8416a4877d2df744.png\">",{"answer":81,"createTime":5,"id":82,"options":83,"question":86,"source":27,"type":87},[],277141608,[84,85],"正确","错误","从理论上说,不确定性和风险是有区别的,前者既已知将来可能发生的若干自然状态又已知各自然状态发生的概率,后者则未知概率",3,{"answer":89,"createTime":5,"id":90,"options":91,"question":92,"source":27,"type":87},[],277141609,[84,85],"敏感性分析法是分析各种不确定性因素变化一定幅度时,对方案经济效果的影响程度.( )",{"answer":94,"createTime":5,"id":95,"options":96,"question":97,"source":27,"type":87},[],277141610,[84,85],"敏感性越高的因素给项目带来的风险越大.( )"]