[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fNR_dRJVSctKpc1jpIfHEUV6tF_sBimV44xyWAXEGtuU":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":19,"related":20,"source":30,"type":31},[],"2025-12-25 04:09:17",284930575,[8,9,10,11],"成本最低","技术最先进","工艺最简单","安全可靠且经济合理",{"count":13,"courseId":14,"courseImg":15,"courseName":16,"workId":17,"workName":18},30,"53e1d2ef4961cca8eea3e23969ad2cb9","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F03a579384a6dc297c89809b582fcc767.png","默认课程","643a24ae24104cea812cda84975c81b8","《建筑施工组织》第38讲 单位工程施工组织设计综合实例 习题","施工组织设计中,施工方案选择应优先考虑的因素是",[21,32,41,50,59,68,77,86,95,104],{"answer":22,"createTime":5,"id":23,"options":24,"question":29,"source":30,"type":31},[],284930566,[25,26,27,28],"工程概预算","施工进度计划","安全管理条例","材料采购合同","单位工程施工组织设计的核心内容是( )","v1",0,{"answer":33,"createTime":5,"id":34,"options":35,"question":40,"source":30,"type":31},[],284930567,[36,37,38,39],"施工机械设备清单","施工部署与施工方案","工程成本控制目标","施工现场平面布置","编制施工组织设计时,首先应明确的是( )",{"answer":42,"createTime":5,"id":43,"options":44,"question":49,"source":30,"type":31},[],284930568,[45,46,47,48],"装饰材料选型","垂直运输设备布置","竣工资料整理","园林绿化方案","某住宅楼主体结构施工阶段,施工组织设计中应重点规划的是( )",{"answer":51,"createTime":5,"id":52,"options":53,"question":58,"source":30,"type":31},[],284930569,[54,55,56,57],"工人生活区距离","材料堆场与作业面的覆盖范围","项目经理办公室视野","工地大门朝向","施工平面布置图中,塔吊的位置确定主要考虑( )",{"answer":60,"createTime":5,"id":61,"options":62,"question":67,"source":30,"type":31},[],284930570,[63,64,65,66],"增加混凝土外加剂用量","调整屋面防水施工顺序","采用装配式楼梯减少湿作业","延长工人每日工作时间","某框架结构工程在雨季施工,施工组织设计中应优先采取的措施是( )",{"answer":69,"createTime":5,"id":70,"options":71,"question":76,"source":30,"type":31},[],284930571,[72,73,74,75],"缩短非关键工作持续时间","将顺序施工改为平行施工","应用关键线路法(CPM)调整逻辑关系","减少质量检查环节","在资源有限条件下优化施工进度计划,最有效的方法是( )",{"answer":78,"createTime":5,"id":79,"options":80,"question":85,"source":30,"type":31},[],284930572,[81,82,83,84],"绘制施工进度横道图","明确施工顺序及主要施工方法","制定劳动力进场计划","分析施工风险与应急预案","在单位工程施工组织设计中,以下哪项工作属于施工部署阶段的核心任务",{"answer":87,"createTime":5,"id":88,"options":89,"question":94,"source":30,"type":31},[],284930573,[90,91,92,93],"工程地质和水文地质条件","周边交通及物流条件","施工人员技术水平","施工材料供应能力","单位工程施工组织设计中,下列哪一项不属于施工条件分析的内容",{"answer":96,"createTime":5,"id":97,"options":98,"question":103,"source":30,"type":31},[],284930574,[99,100,101,102],"网络图","思维导图","甘特图","流程图","在施工进度计划编制中,常用的工具是",{"answer":105,"createTime":5,"id":6,"options":106,"question":19,"source":30,"type":31},[],[8,9,10,11]]