[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fC3SDCenBug7kgBGaIdeQrlW0HVxSRmqhvO2O5Zfm_wY":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":13,"question":17,"related":18,"source":22,"type":23},[],"2026-03-15 04:13:38",323285677,[8,9,10,11,12],"发包人应按银行同期存款利率向甲支付拖欠款的利息,并承担违约责任","甲可与发包人协议将工程折价,并从工程折价的价款中优先受偿","甲可以申请法院将工程依法拍卖,并从拍卖的价款中优先受偿","若发包人要求交付工程,乙承包商应当交付付工程,乙承包商应承担保管责任","若发包人要求交付工程,乙承包商应当交付",{"courseId":14,"courseImg":15,"courseName":16},"863840db360b42dd28a538a42e73bbae","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F7e2d5ad53be3d12aacc56ee37db405b7.jpg","建设工程投资控制","某项目包含两个单项工程,分别发包给甲、乙两个承包商.工程竣工后,发包人在收到甲递交的竣工结算报告及资料后2个月还没支付结算价款;发包人认可竣工验收报告已经1个月,但乙一直未提交完整的竣工结算报告及资料.对此,以下说法正确的有( ).",[19,24,34,43,53,62,71,80,89,98],{"answer":20,"createTime":5,"id":6,"options":21,"question":17,"source":22,"type":23},[],[8,9,10,11,12],"v1",1,{"answer":25,"createTime":5,"id":26,"options":27,"question":33,"source":22,"type":23},[],323285678,[28,29,30,31,32],"按月结算","竣工后一次结算","按旬结算","分段阶段","目标结款方式","工程价款的主要结算方式包括().",{"answer":35,"createTime":5,"id":36,"options":37,"question":42,"source":22,"type":23},[],323285679,[38,39,40,41],"工程量等清单缺项","不可抗力","物价变动","提前竣工","发承包双方在约定调整合同价款的事项中,属于工程变更类的是( ).",{"answer":44,"createTime":5,"id":45,"options":46,"question":51,"source":22,"type":52},[],323285680,[47,48,49,50],"按施工工期平均分摊安全文明施工费,与进度款同期支付","按合同建筑安装工程费分摊安全文施工费,与进度款同期支付","在开工后28天内预付不低于当年施工进度计划的安全文明施工费总额的60%,其余部分与进度款同期支付","在正式开工前预付不低于当年施工进度计划的安全文明施工费总额的60%","关于安全文明施工费的支付,下列说法正确的是( ).",0,{"answer":54,"createTime":5,"id":55,"options":56,"question":61,"source":22,"type":52},[],323285681,[57,58,59,60],"1600","4000","4800","6400","8.已知某建筑工程施工合同总额为8000万元,工程预付款按合同金额的20%计取,主要材料及构件造价占合同额的50%.预付款起扣点为( )万元.",{"answer":63,"createTime":5,"id":64,"options":65,"question":70,"source":22,"type":52},[],323285682,[66,67,68,69],"分段结算的工程,可按月预支工程款","按月结算的工程,不可分段结算,需进行竣工结算","按月结算是在施工过程中按月结算工程款,不需预付","只有工程承包合同价在100万元以下的才可实行竣工后一次结算","下列关于工程价款主要结算方式的说法,正确的是( ).",{"answer":72,"createTime":5,"id":73,"options":74,"question":79,"source":22,"type":52},[],323285683,[75,76,77,78],"固定总价","固定单价","调值总价","成本加酬金","对施工工期较长,承包方为减少由于通货膨胀引起工程成本增加的风险,应尽可能采用( )合同.",{"answer":81,"createTime":5,"id":82,"options":83,"question":88,"source":22,"type":52},[],323285684,[84,85,86,87],"10%,20%","20%,30%","10%,30%","15%,25%","包工包料的预付款应按合同约定拨付,原则上预付比例不低于合同全额的( ),不高于合同全额的( ).",{"answer":90,"createTime":5,"id":91,"options":92,"question":97,"source":22,"type":52},[],323285685,[93,94,95,96],"按审价部门提出的价格调整","按发包人指定的价格调整","按设计部门提出的价格调整","由承包人或发包人提出适当的变更价格,经对方确认后调整","合同中没有适用或类似变更工程的价格,则变更部分的价款调整应该().",{"answer":99,"createTime":5,"id":100,"options":101,"question":106,"source":22,"type":52},[],323285686,[102,103,104,105],"15 天","30 天","45 天","三个月","中标通知书发出后( )天内,双方应按照招标文件和投标文件订立书面合同."]