[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fIYgyVHTLSv7-vWgOoDs6Bgc1c5lygQUfwC1C2GBDuts":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":16,"related":17,"source":27,"type":28},[],"2026-03-18 01:25:19",324588918,[8,9,10,11],"施工单位企业管理费","建设单位工程建设其他费","施工单位其他工程费","建设单位预备费",{"courseId":13,"courseImg":14,"courseName":15},"53e1d2ef4961cca8eea3e23969ad2cb9","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F03a579384a6dc297c89809b582fcc767.png","默认课程","根据《建筑安装工程费用项目组成》(建标[2013]44号),应建设单位要求对结构件进行破坏性检验发生的费用应由( )列支",[18,29,38,47,56,65,73,79,82,91],{"answer":19,"createTime":5,"id":20,"options":21,"question":26,"source":27,"type":28},[],324588911,[22,23,24,25],"接受委托编制标底的中介机构可以参加受托编制标底项目的投标","投标报价不得低于工程成本","非国有资金投资的建筑工程招标的,应当设有最高投标限价","国有资金投资的建筑工程招标的,应当设有标底","根据相关规定,关于招标价格,下列说法正确的是( )","v1",0,{"answer":30,"createTime":5,"id":31,"options":32,"question":37,"source":27,"type":28},[],324588912,[33,34,35,36],"措施费","规费","材料费","企业管理费","根据《建筑安装工程费用项目组成》(建标【2013】44号),施工企业对建筑以及材料、 构件和建筑安装物进行一般鉴定、检查所发生的费用,应计入建筑安装工程费用项目中的( )",{"answer":39,"createTime":5,"id":40,"options":41,"question":46,"source":27,"type":28},[],324588913,[42,43,44,45],"特殊情况下支付的工资","津贴补贴","医疗保险费","职工福利费","根据《建筑安装工程费用项目组成》(建标〔2013]44号),因病而按计时工资标准的一定比例支付的工资属于( )",{"answer":48,"createTime":5,"id":49,"options":50,"question":55,"source":27,"type":28},[],324588914,[51,52,53,54],"夜间施工增加费","冬雨期施工增加费","已完工程保护费","安全文明施工费","根据《建设工程工程量清单计价规范》(GB50500-2013),投标时不能作为竞争性费用的是( )",{"answer":57,"createTime":5,"id":58,"options":59,"question":64,"source":27,"type":28},[],324588915,[60,61,62,63],"采购及保管费","工程定位复测费","检验试验费","脚手架搭、拆、运输费用","下列建筑安装工程费用,属于材料费的是( )",{"answer":66,"createTime":5,"id":67,"options":68,"question":72,"source":27,"type":28},[],324588916,[69,35,70,71],"人工费","临时设施费","施工机具使用费","根据《建筑安装工程费用项目组成》(建标[2013]44号),下列建筑安装工程费用项目中,属于措施项目费的是( )",{"answer":74,"createTime":5,"id":75,"options":76,"question":78,"source":27,"type":28},[],324588917,[36,33,69,77],"社会保险费","根据《建筑安装费用项目组成》(建标[2013]44号),施工企业生产工人的劳动保护费应计入建筑安装工程( )",{"answer":80,"createTime":5,"id":6,"options":81,"question":16,"source":27,"type":28},[],[8,9,10,11],{"answer":83,"createTime":5,"id":84,"options":85,"question":90,"source":27,"type":28},[],324588919,[86,87,88,89],"建设单位管理费","建筑安装工程直接工程费","建筑安装工程措施项目费","建筑安装工程现场经费","在竣工验收前,对已完工程及设备进行保护所需的费用属于( )",{"answer":92,"createTime":5,"id":93,"options":94,"question":98,"source":27,"type":28},[],324588920,[95,96,34,97],"分部分项工程费","措施项目费","其他项目费用","根据现行《建筑安装工程费用项目组成》(建标[2013]44号),对于施工合同签订时尚未确定或者不可预见的所需材料、工程设备、服务的采购,以及施工中可能发生的工程变更、合同约定调整因素出现时的工程价款调整以及发生的索赔、现场签证确认等费用,应计入( )"]