[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fKXppodkiBKWEtYKZQ0ytfgJjEIA_gn0yDcPkYytXJH4":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":14,"question":18,"related":19,"source":29,"type":83},[],"2026-03-25 00:23:55",327827336,[8,9,10,11,12,13],"节点四周包柱的抗剪和抗弯计算","统计荷载,计算柱轴力","设计构造复核","截面削弱后的柱截面承载力验算","选择托换结点截面尺寸","托换结点受剪承载力计算",{"courseId":15,"courseImg":16,"courseName":17},"f25ccc5ec83501e1b98d91f6d4fdf561","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002Fe806e72685df793f2993881c51d28679.jpg","土木工程事故分析与处理","植筋柱托换结点设计中,要按步骤进行计算设计,请给下面的设计流程排序",[20,31,40,50,59,65,70,75,80,84],{"answer":21,"createTime":5,"id":22,"options":23,"question":28,"source":29,"type":30},[],327827328,[24,25,26,27],"托换节点","墙体托换梁","托换柱","连系梁","下面选项哪个不属于托换桁架","v1",0,{"answer":32,"createTime":5,"id":33,"options":34,"question":39,"source":29,"type":30},[],327827329,[35,36,37,38],"连梁的设置一般要沿结构拉通,当空间较大时,建议4m&times;6m设置","计算简图中假定匀速平移过程中水平动力作用点为铰结点,摩擦力反方向作用到托架上","托架的内力计算按照正常受力分析计算","托架杆件设计应同时考虑水平荷载和竖向荷载作用","关于托架设计,哪项是不正确的()",{"answer":41,"createTime":5,"id":42,"options":43,"question":48,"source":29,"type":49},[],327827330,[44,45,46,47],"建筑物鉴定等级分为四个等级","鉴定等级为一级、二级时,可以直接进行移位设计","鉴定等级为三级、四级时,可以直接进行移位设计","鉴定等级为三级、四级时,亦可进行移位设计,但需进行结构加固","建筑物整体移位工程在设计前应进行结构监测及安全性鉴定,下面说法正确的是()",1,{"answer":51,"createTime":5,"id":52,"options":53,"question":58,"source":29,"type":49},[],327827331,[54,55,56,57],"商铺改银行","柱外包砖,且增设钢轨","增设水箱","增加一层","大楼在建造过程中,进行了一系列的修改,具体包含",{"answer":60,"createTime":5,"id":61,"options":62,"question":63,"source":29,"type":64},[],327827332,[],"建筑整体移位工程的设计包括:____设计、____设计、____设计、____设计和____设计",2,{"answer":66,"createTime":5,"id":67,"options":68,"question":69,"source":29,"type":64},[],327827333,[],"单托梁墙体托换的施工段长度一般为____~ ____m,且施工段长度不宜超过本道墙体长度的____分之一(中文大写数字表示)",{"answer":71,"createTime":5,"id":72,"options":73,"question":74,"source":29,"type":64},[],327827334,[],"动力设备一般选择____",{"answer":76,"createTime":5,"id":77,"options":78,"question":79,"source":29,"type":64},[],327827335,[],"动态实时监测主要是____的全程监测",{"answer":81,"createTime":5,"id":6,"options":82,"question":18,"source":29,"type":83},[],[8,9,10,11,12,13],13,{"answer":85,"createTime":5,"id":86,"options":87,"question":95,"source":29,"type":83},[],327827337,[88,89,90,91,92,93,94],"苫布结构于原基础分离","竣工验收","同步迁移","规划新址修建新基础","新旧基础间修建轨道","进场","就位连接","移位工程施工流程,请排序"]