[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fZZoj2al1kONHTkUoEvvGQCCNbd7NprUlJ3MIX90VVBg":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":19,"related":20,"source":29,"type":30},[],"2026-05-09 23:19:15",364394102,[8,9,10,11],"USD10,780.00","USD12,000.00","USD11,000.00","USD10,450.00",{"count":13,"courseId":14,"courseImg":15,"courseName":16,"workId":17,"workName":18},11,"53e1d2ef4961cca8eea3e23969ad2cb9","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F03a579384a6dc297c89809b582fcc767.png","默认课程","work_53115385","信用证审核及单据作业","The invoice showing value counted as follows:FOB Value: USD9,800.00Freight: USD100.00Insurance: USD100.00CIF Xiamen USD10,000.00Less discount: USD500.00Total amount payable: USD9,500.00The minimum amount of insurance coverage is _________",[21,31,34,42,51,59,67,76,84,93],{"answer":22,"createTime":5,"id":23,"options":24,"question":28,"source":29,"type":30},[],364394099,[25,26,27],"documents with no goods indicated therein","all documents (not only transport documcntsl, except drafts","only transport documents","&quot;Shipping documents&quot; mean","v1",0,{"answer":32,"createTime":5,"id":6,"options":33,"question":19,"source":29,"type":30},[],[8,9,10,11],{"answer":35,"createTime":5,"id":36,"options":37,"question":41,"source":29,"type":30},[],364394104,[38,39,40],"May 8","May 5","May 1","Suppose a LC allows goods to be loaded from Europeans ports, and requires the draft to be mature 30 days after shipment date. But there are three on board notations on the bill of lading, evidencing goods loaded in board at three different port, dated May 1, May 5, and May 8 respectively. the draft due date will be calculated from",{"answer":43,"createTime":5,"id":44,"options":45,"question":50,"source":29,"type":30},[],364394107,[46,47,48,49],"the inspection certificate issued by SGS","the inspection certificate issued by CIQ","the inspection certificate issued by the inspection bureau of exporting country","the inspection certificate issued by the beneficiary","The letter of credit calls for an inspection certificate to be issued by the competent authority, which document is not in compliance with the term? _______",{"answer":52,"createTime":5,"id":53,"options":54,"question":58,"source":29,"type":30},[],364394111,[55,56,57],"10 days after May 5","10 days after May 1","10 days after May 10","Suppose the draft is drawn at l0 days sight on the confirming bank but is refused 5 days later (May 1). The drawee bank does not waive the discrepancies and sends the documents to the issuing bank on May 5. The issuing bank receives the documents on the same day. Afer approaching the applicant the issuing bank agrees to accept the documents and sends an acceptance notice to the beneficiary on May 10. Which day should be the maturity date",{"answer":60,"createTime":5,"id":61,"options":62,"question":66,"source":29,"type":30},[],364394116,[63,64,65],"must agree with that of the credit","must agree with what the nominated bank honours or negotiates","must agree with that of the invoice","As per UCP600 sub-aricle 18(b), the invoice value can be issued for an amount in excess of the amount permitted by the credit, provided the nominated bank has not honoured or negotiated for an amount in excess of that permitted by the credit. In this case the amount of the draft",{"answer":68,"createTime":5,"id":69,"options":70,"question":75,"source":29,"type":30},[],364394119,[71,72,73,74],"Only the certificate of quality is discrepant for the beneficiary's address shown on it differs from that of invoice","Only the invoice is discrepant for beneficiary's address shown on it differs from the credit","Neither invoice nor certificate of quality is discrepant","Both invoice and certificate of quality are discrepant, as one is different from another on beneficiary's address","L\u002FC stipulates beneficiary as &quot;ABC company, 10 Jianshe Road, Shenzhen City, China&quot;. Invoice shows beneficiary as &quot;ABC company, 15 Liuhua Road, Guangzhou City, China&quot;. The certificate of quality issued by the beneficiary shows beneficiary as &quot;ABC company, 10 Jianshe Road, Shenzhen City, China&quot;, the correct comment is",{"answer":77,"createTime":5,"id":78,"options":79,"question":83,"source":29,"type":30},[],364394123,[80,81,82],"Insurance declaration under open cover for EUR250,000","Insurance certificate for EUR250,000","Insurance certificate for EUR275,000","A credit requires presentation of an Insurance Policy or Certificate. Which of the following insurance documents would be acceptable for a CIF shipment where the invoice value is EUR250,000",{"answer":85,"createTime":5,"id":86,"options":87,"question":92,"source":29,"type":30},[],364394127,[88,89,90,91],"certificate of origin","invoice","insurance document","transport document as part of the information of consignee or notify party","According to UCP600, the applicant's address shown on must be the same to the Applicant's address indicated in the credit",{"answer":94,"createTime":5,"id":95,"options":96,"question":100,"source":29,"type":30},[],364394130,[97,98,99],"On the condition that the nominated bank agrees to honour or negotiate, the draft can be drawn by the nominated bank instead of the beneficiary","The draft must be drawn by beneficiary including the second beneficiary in the event the first beneficiary fails to substitute its own draft for that of the second beneficiary","Only when the issuing bank is the drawee bank can the draft be drawn by the beneficiary","Choose the answer which is consistent with UCP600"]