[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fdVOxApBw9sqlM7qJSX6CWyrNnVaHCKTZM5D-L8Wwia4":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":16,"related":17,"source":27,"type":28},[],"2026-05-11 00:21:50",365683625,[8,9,10,11],"拉力试验和弯曲角度","抗拉强度和冷弯试验","拉力试验和冷弯试验","屈服强度和伸长率",{"courseId":13,"courseImg":14,"courseName":15},"246bdc0a73a4ea13a6b7cd87d0a60840","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002Fa846b7a6fb18eaad84b93d27f7791f62.jpg","土木工程施工","钢筋力学试验检查的内容有()",[18,29,38,47,50,59,68,77,86,95],{"answer":19,"createTime":5,"id":20,"options":21,"question":26,"source":27,"type":28},[],365683622,[22,23,24,25],"调直切断机","钢筋钳","钢筋切断机","砂轮切割机","工程中切断粗钢筋的主要设备为()","v1",0,{"answer":30,"createTime":5,"id":31,"options":32,"question":37,"source":27,"type":28},[],365683623,[33,34,35,36],"土的孔隙与所取天然土样体积","土中水的质量与所取天然土样的质量","土中水的质量与土的固体颗粒质量","土中水的体积与所取天然土","土的天然含水量是指()之比的百分率",{"answer":39,"createTime":5,"id":40,"options":41,"question":46,"source":27,"type":28},[],365683624,[42,43,44,45],"计算挖方量和填方量","确定场地的设计标高","选择土方机械","拟订调配方案","场地平整前的首要工作是()",{"answer":48,"createTime":5,"id":6,"options":49,"question":16,"source":27,"type":28},[],[8,9,10,11],{"answer":51,"createTime":5,"id":52,"options":53,"question":58,"source":27,"type":28},[],365683626,[54,55,56,57],"先浅后深","由四周向中央施打","由两侧向中间对称施打","由中间向两侧对称施打","一般当桩的中心距小于或等于四倍桩径或边长时,可采用()的施打顺序",{"answer":60,"createTime":5,"id":61,"options":62,"question":67,"source":27,"type":28},[],365683627,[63,64,65,66],"先深后浅","先小后大","先短后长","自四周向中间进行","下列预应力混凝土管桩压桩的施工顺序中,正确的是()",{"answer":69,"createTime":5,"id":70,"options":71,"question":76,"source":27,"type":28},[],365683628,[72,73,74,75],"全面分层","斜面分层","分段分层","局部分层","当混凝土厚度不大而面积很大时.宜采用()方法进行浇筑",{"answer":78,"createTime":5,"id":79,"options":80,"question":85,"source":27,"type":28},[],365683629,[81,82,83,84],"现浇砼","泥浆","钢护筒","砌砖","钻孔灌注桩一般采用()护壁",{"answer":87,"createTime":5,"id":88,"options":89,"question":94,"source":27,"type":28},[],365683630,[90,91,92,93],"对总工期及后续工作均不影响","不影响总工期,影响后续工作","不影响后续工作,影响总工期","对总工期及后续工作均有影响","在工程网络计划执行过程中,某项工作比原计划拖后,而未超过该工作的自由时差,则()",{"answer":96,"createTime":5,"id":97,"options":98,"question":103,"source":27,"type":28},[],365683631,[99,100,101,102],"基坑(槽)的位置、尺寸、标高、和边坡是否符合设计要求","槽底土的均匀程度和含水量情况","降水方法与效益","是否已挖到持力层","观察验槽的内容不包括()"]