[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fxdgLVBmiROytyyPvitxurfEdoBU0uoXWYzcEwykOD-k":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":16,"related":17,"source":28,"type":29},[],"2026-05-30 09:17:38",392989840,[8,9,10,11],"飞天","阿狸","唐妞","九色鹿",{"courseId":13,"courseImg":14,"courseName":15},"53e1d2ef4961cca8eea3e23969ad2cb9","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F03a579384a6dc297c89809b582fcc767.png","默认课程","陕西历史博物馆的IP形象是",[18,30,39,48,57,66,75,84,93,102],{"answer":19,"createTime":20,"id":21,"options":22,"question":27,"source":28,"type":29},[],"2026-05-11 00:21:50",365683622,[23,24,25,26],"调直切断机","钢筋钳","钢筋切断机","砂轮切割机","工程中切断粗钢筋的主要设备为()","v1",0,{"answer":31,"createTime":20,"id":32,"options":33,"question":38,"source":28,"type":29},[],365683623,[34,35,36,37],"土的孔隙与所取天然土样体积","土中水的质量与所取天然土样的质量","土中水的质量与土的固体颗粒质量","土中水的体积与所取天然土","土的天然含水量是指()之比的百分率",{"answer":40,"createTime":20,"id":41,"options":42,"question":47,"source":28,"type":29},[],365683624,[43,44,45,46],"计算挖方量和填方量","确定场地的设计标高","选择土方机械","拟订调配方案","场地平整前的首要工作是()",{"answer":49,"createTime":20,"id":50,"options":51,"question":56,"source":28,"type":29},[],365683625,[52,53,54,55],"拉力试验和弯曲角度","抗拉强度和冷弯试验","拉力试验和冷弯试验","屈服强度和伸长率","钢筋力学试验检查的内容有()",{"answer":58,"createTime":20,"id":59,"options":60,"question":65,"source":28,"type":29},[],365683626,[61,62,63,64],"先浅后深","由四周向中央施打","由两侧向中间对称施打","由中间向两侧对称施打","一般当桩的中心距小于或等于四倍桩径或边长时,可采用()的施打顺序",{"answer":67,"createTime":20,"id":68,"options":69,"question":74,"source":28,"type":29},[],365683627,[70,71,72,73],"先深后浅","先小后大","先短后长","自四周向中间进行","下列预应力混凝土管桩压桩的施工顺序中,正确的是()",{"answer":76,"createTime":20,"id":77,"options":78,"question":83,"source":28,"type":29},[],365683628,[79,80,81,82],"全面分层","斜面分层","分段分层","局部分层","当混凝土厚度不大而面积很大时.宜采用()方法进行浇筑",{"answer":85,"createTime":20,"id":86,"options":87,"question":92,"source":28,"type":29},[],365683629,[88,89,90,91],"现浇砼","泥浆","钢护筒","砌砖","钻孔灌注桩一般采用()护壁",{"answer":94,"createTime":20,"id":95,"options":96,"question":101,"source":28,"type":29},[],365683630,[97,98,99,100],"对总工期及后续工作均不影响","不影响总工期,影响后续工作","不影响后续工作,影响总工期","对总工期及后续工作均有影响","在工程网络计划执行过程中,某项工作比原计划拖后,而未超过该工作的自由时差,则()",{"answer":103,"createTime":20,"id":104,"options":105,"question":110,"source":28,"type":29},[],365683631,[106,107,108,109],"基坑(槽)的位置、尺寸、标高、和边坡是否符合设计要求","槽底土的均匀程度和含水量情况","降水方法与效益","是否已挖到持力层","观察验槽的内容不包括()"]