[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fefj7nNZh9mADQIrvKIiFK_8bPplJZ5iD6HE78fjlbIU":3},{"id":4,"source":5,"question":6,"options":7,"answer":12,"related":13,"type":24,"origin":111,"createTime":26},48235177,"v1","跨度为5m、混凝土强度为C25的现浇混凝土板,当混凝土强度至少应达到( )时方可拆除底模",[8,9,10,11],"15 MPa","18.75MPa","20 MPa","25 MPa",[],[14,27,37,47,57,67,71,81,91,101],{"id":15,"source":5,"question":16,"options":17,"answer":22,"related":23,"type":24,"origin":25,"createTime":26},48235172,"砼必须养护至其强度达到( )时,才能够在其上行人或安装模板支架",[18,19,20,21],"1.2Mpa","1.8Mpa","2.4Mpa","3.0Mpa",[],[],0,null,"2023-06-05T22:50:12+08:00",{"id":28,"source":5,"question":29,"options":30,"answer":35,"related":36,"type":24,"origin":25,"createTime":26},48235173,"某框架-剪力墙结构,框架柱间距9m,楼盖为梁板结构.第三层楼板施工当天气温为35℃.施工单位制定了完整的施工方案,采用商品砼C30.钢筋现场加工,采用木模板,由木工制作好后直接拼装.对跨度为9m的现浇钢筋砼梁,当设计无具体要求时,其跨中起拱高度可为( )",[31,32,33,34],"2mm","5mm","15mm","30mm",[],[],{"id":38,"source":5,"question":39,"options":40,"answer":45,"related":46,"type":24,"origin":25,"createTime":26},48235174,"对采用硅酸盐水泥,普通硅酸盐水泥拌制的混凝土,浇水养护的时间不得少于( )",[41,42,43,44],"3 d","7 d","14 d","28 d",[],[],{"id":48,"source":5,"question":49,"options":50,"answer":55,"related":56,"type":24,"origin":25,"createTime":26},48235175,"当施工最高气温超过300C,水泥砂浆应在( )内使用完毕",[51,52,53,54],"2h","3h","4h","5h",[],[],{"id":58,"source":5,"question":59,"options":60,"answer":65,"related":66,"type":24,"origin":25,"createTime":26},48235176,"振捣棒\"快插和慢拔\"中的\"快插\"是为防止出现( )现象",[61,62,63,64],"表层离析","中层离析","下层离析","孔洞",[],[],{"id":4,"source":5,"question":6,"options":68,"answer":69,"related":70,"type":24,"origin":25,"createTime":26},[8,9,10,11],[],[],{"id":72,"source":5,"question":73,"options":74,"answer":79,"related":80,"type":24,"origin":25,"createTime":26},48235178,"搅拌混凝土时,要按照砂石的实际( )进行调整,所得配合比称施工配合比",[75,76,77,78],"含泥量","称量误差","含水量","粒径",[],[],{"id":82,"source":5,"question":83,"options":84,"answer":89,"related":90,"type":24,"origin":25,"createTime":26},48235179,"插入式振动棒的操作要点是( )",[85,86,87,88],"快拔慢插","慢拔慢插","快拔快插","慢拔快插",[],[],{"id":92,"source":5,"question":93,"options":94,"answer":99,"related":100,"type":24,"origin":25,"createTime":26},48235180,"混凝土施工配制强度应( )混凝土设计强度标准值",[95,96,97,98],"小于","等于","大于","B或C",[],[],{"id":102,"source":5,"question":103,"options":104,"answer":109,"related":110,"type":24,"origin":25,"createTime":26},48235181,"某框架结构上一6m×2.5m的板,因施工组织原因不能连续浇筑,则施工缝应留在( )",[105,106,107,108],"平行于6m的任何位置","平行于2.5m的任何位置","无法确定,按设计要求留置","框架梁受力即可,施工缝可留置在板的任何位置",[],[],{"courseName":112,"courseImg":113,"workName":114,"workId":115,"count":116,"courseId":117},"建筑智慧施工技术","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F1306a0bec01cf9694988b134edbf7867.gif","项目四 混凝土工程智慧施工","work_28079836",20,"a142256a29f92204066cb6926c78e26d"]