[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fbDjb3F0WFl_LF46FZuIFtx9WwQJRxgujBLc6Va6mZ-Q":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":19,"related":20,"source":31,"type":32},[],"2023-09-07 22:44:56",96481815,[8,9,10,11],"费用和工期损失全部由承包人承担","费用和工期损失全部由发包人承担","费用由发包人承担,工期不顺延","费用由承包人承担,工期给予顺延",{"count":13,"courseId":14,"courseImg":15,"courseName":16,"workId":17,"workName":18},20,"51d258790f2cb1faa52771afe4059462","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002Fdc84b8ff8e2534b4ccb84639c78420f1.png","工程招投标与合同管理","b6d5fe5775394f82b44389d67b16ad82","7.4章节测验","某工程部位隐蔽前曾得到监理工程师的认可,但重新检验后发现质量未达到合同约定的要求,则关于全部剥露、返工的费用和工期处理的说法,正确的是()",[21,33,42,51,60,70,80,89,99,109],{"answer":22,"createTime":23,"id":24,"options":25,"question":30,"source":31,"type":32},[],"2023-09-06 19:42:37",96360542,[26,27,28,29],"发包人支付发生的全部费用,工期不予顺延","发包人支付发生的全部费用,工期给予顺延","承包人支付发生的全部费用,工期不予顺延","承包人支付发生的全部费用,工期给予顺延","某施工合同履行过程中,经监理工程师确定质量合格后已隐蔽的工程,工程师又要求重新检验.重检后结果为质量合格,则下列说法正确()","v1",0,{"answer":34,"createTime":23,"id":35,"options":36,"question":41,"source":31,"type":32},[],96360544,[37,38,39,40],"公路管理部门","承包人","发包人","承包人与发包人","某施工合同履行过程中,承包人发现由于公路管理部门的责任,连接施工现场地与国道之间的道路不符合招标文件中说明的条件,则承包人由此增加的费用应由()承担",{"answer":43,"createTime":23,"id":44,"options":45,"question":50,"source":31,"type":32},[],96360547,[46,47,48,49],"不确定的","单向的","无法确定的","双向的","在我国工程合同索赔中,既有承包人向发包人索赔,也有发包人向承包人索赔,这说明我国工程合同索赔是()",{"answer":52,"createTime":23,"id":53,"options":54,"question":59,"source":31,"type":32},[],96360550,[55,56,57,58],"提出索赔要求","报送索赔资料","监理人答复","上级调解","不属于索赔程序的是()",{"answer":61,"createTime":62,"id":63,"options":64,"question":68,"source":31,"type":69},[],"2023-09-07 22:44:57",96360553,[55,56,65,66,67],"监理工程师答复、工程师逾期答复后果、持续索赔","领导协调","仲裁与诉讼","索赔的程序包括()",1,{"answer":71,"createTime":62,"id":72,"options":73,"question":79,"source":31,"type":69},[],96360555,[74,75,76,77,78],"证据部分","政论部分","总述部分","索赔款项(或工期)计算部分","摘要部分","索赔报告包括()",{"answer":81,"createTime":62,"id":82,"options":83,"question":88,"source":31,"type":69},[],96360557,[84,85,86,87],"当事人可以通过和解或调解解决合同争议","当事人不愿和解、调解,可根据仲裁协议向仲裁机构申请仲裁","当事人不履行仲裁协议的,对方可以请求人民法院执行","当事人有订立仲裁协议的,当事人可以选择向仲裁机构申请仲裁机构申请仲裁或向人民法院起诉","关于《合同法》中解决合同争议的方式,下列表述正确的有()",{"answer":90,"createTime":62,"id":91,"options":92,"question":98,"source":31,"type":69},[],96360559,[93,94,95,96,97],"招标公告","来往信件","各种会议纪要","施工进度计划和实施施工进度记录","施工现场的工程文件","工程索赔中的证据包括()",{"answer":100,"createTime":62,"id":101,"options":102,"question":108,"source":31,"type":69},[],96360561,[103,104,105,106,107],"与合同对照,事件已造成了承包人的额外支出或直接工期损失","造成费用增加或工期损失的原因,按合同约定不属于承包人的行为责任或风险责任","承包人按合同规定的程序提交索赔意向通知和索赔报告","造成费用增加或工期损失额度巨大","索赔费用容易计算","公路工程索赔成立的条件有()",{"answer":110,"createTime":5,"id":6,"options":111,"question":19,"source":31,"type":32},[],[8,9,10,11]]