[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fVao3AnwFVzE8cIQG7FTgliKgW2W48biKgdPKU78IbYU":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":15,"related":16,"source":20,"type":21},[],"2025-06-16 09:06:08",1061824800,[8,9,10,11],"设计单位","建设单位","施工单位","设备供应单位",{"courseImg":13,"courseName":14},"https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F2cc011c67c3293818cf0a71f65261ef0.png","工程招投标及合同管理","设备安装工程具备联动无负荷试车条件的,应当由( )组织试车",[17,22,32,44,53,63,73,83,93,102],{"answer":18,"createTime":5,"id":6,"options":19,"question":15,"source":20,"type":21},[],[8,9,10,11],"v2",0,{"answer":23,"createTime":24,"id":25,"options":26,"question":31,"source":20,"type":21},[],"2025-06-16 09:06:09",1061824916,[27,28,29,30],"提交投标文件截止时间的同一时间","提交投标文件截止时间的24小时内","提交投标文件截止时间的30天内","提交投标文件截止时间后的任何时间","招标投标法规定开标的时间应当是( )",{"answer":33,"createTime":34,"id":35,"options":36,"question":42,"source":20,"type":43},[],"2025-06-16 09:06:11",1061824938,[37,38,39,40,41],"基础设施工程的保修期为设计文件规定的该工程合理使用年限","屋面防水工程的保修期为4年","建设工程保修期的起始日是提交竣工验收报告之日","保修期结束后返还质量保证金","在保修期内施工企业一直负有维修保修义务","关于工程保修期的说法正确的有( )",1,{"answer":45,"createTime":24,"id":46,"options":47,"question":52,"source":20,"type":21},[],1061824970,[48,49,50,51],"费用和工期损失全部由业主承担","费用和工期损失全部由承包商承担","费用由承包商承担,工期给予顺延","工期不予顺延,但费用由业主给予补偿","承包商按照监理工程师的指示对已隐蔽的工程部位进行剥露的重新检验.该工程部位隐蔽前曾得到监理工程师的质量认可,但重新检验后发现质量未到达合同规定的要求,则全部剥露、修复、重新隐蔽的费用和损失的工期处理为( )",{"answer":54,"createTime":34,"id":55,"options":56,"question":62,"source":20,"type":43},[],1061825261,[57,58,59,60,61],"付款周期末已实施工程的价款金额","工程预付款的支付金额","工程预付款的扣回金额","按合同约定价格调整的金额","按合同约定经监理人核实的计日工金额","根据《标准施工招标文件》中的通用合同条款,质量保证金的计算基数应包括( )",{"answer":64,"createTime":34,"id":65,"options":66,"question":72,"source":20,"type":43},[],1061825298,[67,68,69,70,71],"承包人投入施工设备的数量超过了投标文件承诺的数量","为完成工程需要追加的额外工作","改变合同中任何一项工作的施工时间","改变合同中任何一项工作的质量特性","承包人在合同中的某项工作转由发包人自行实施","根据《施工合同示范文本》中的通用合同条款,施工合同履行期间,属于变更范围的有( )",{"answer":74,"createTime":34,"id":75,"options":76,"question":82,"source":20,"type":43},[],1061825327,[77,78,79,80,81],"经菅状况严重恶化","转移财产、抽逃资金,以逃避债务","丧失商业信誉","出现表见代理情况","准备行使不安抗辩权","应当先履行债务的当事人,有确切证据证明对方有下列情形中的( ),可以中止履行",{"answer":84,"createTime":34,"id":85,"options":86,"question":92,"source":20,"type":43},[],1061825350,[87,88,89,90,91],"办理施工许可证","提供工程进度计划","确定坐标控制点","做好施工现场地下管线的保护工作","协调处理施工现场周围地下管线的保护工作","依照施工合同示范文本通用条款的规定,( )属于发包人应当完成的工作",{"answer":94,"createTime":24,"id":95,"options":96,"question":101,"source":20,"type":21},[],1061825407,[97,98,99,100],"要约到达对方之前或同时","对方发出承诺之前","对方承诺要达要约人之前","对方承诺生效之后","要约人要撤销要约,撤销要约通知应在( )到达对方",{"answer":103,"createTime":34,"id":104,"options":105,"question":111,"source":20,"type":43},[],1061825468,[106,107,108,109,110],"合同中已有适用于变更工程的价格,按合同已有的价格变更合同条款","合同中只有类似于变更工程的价格,可以参照类似价格变更合同价款","合同中只有类似于变更工程的价格,不应参照类似价格变更合同价款","合同中没有适用或类似于变更工程的价格,由承包人提出适当的变更价格,经监理工程师确认后执行","合同中没有适用或类似于变更工程的价格,由监理工程师提出适当变更价格,经承包人确认后执行","建筑工程施工合同约定的工程变更价款的确定方法有( )"]