[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$f_m7zmNG-eoON5a7JuQx5BzFispOw7rkdh8t34N_ZmXM":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":16,"related":17,"source":25,"type":30},[],"2026-05-19 16:53:05",1118927605,[8,9,10,11],"套筒灌浆流动度","灌浆压力","灌浆饱满度","后浇混凝土蜂窝、麻面、裂缝原因",{"courseId":13,"workId":14,"workName":15},"1000084130","66986037","第五章单元测试","节点连接关键技术分析内容包括( )",[18,27,31,36,45,54,63,68,73,82],{"answer":19,"createTime":5,"id":20,"options":21,"question":24,"source":25,"type":26},[],1118927602,[22,23],"对","错","构件吊运过程中,构件下方可以短暂停留人员.( )","v2",3,{"answer":28,"createTime":5,"id":6,"options":29,"question":16,"source":25,"type":30},[],[8,9,10,11],1,{"answer":32,"createTime":5,"id":33,"options":34,"question":35,"source":25,"type":26},[],1118927607,[22,23],"后浇混凝土浇筑后不需要养护.( )",{"answer":37,"createTime":5,"id":38,"options":39,"question":44,"source":25,"type":30},[],1118927608,[40,41,42,43],"高空作业风险","构件坠落风险","构件变形风险","构件错位风险","水平构件吊装安全风险包括( )",{"answer":46,"createTime":5,"id":47,"options":48,"question":52,"source":25,"type":53},[],1118927610,[49,50,51,49],"5MPa","8MPa","10MPa","吊装上一层结构构件前,当混凝土强度无设计要求时,其最低强度应不小于( )",0,{"answer":55,"createTime":5,"id":56,"options":57,"question":62,"source":25,"type":53},[],1118927613,[58,59,60,61],"1mm","2mm","3mm","5mm","梁底支撑标高调整必须高出梁底结构标高( )",{"answer":64,"createTime":5,"id":65,"options":66,"question":67,"source":25,"type":26},[],1118927616,[22,23],"梁底支撑间距可大于 1.5 m,只要支撑牢固即可.( )",{"answer":69,"createTime":5,"id":70,"options":71,"question":72,"source":25,"type":26},[],1118927619,[22,23],"宜昌市伍家岗区共勤村安置房建设项目工程工期总日历天数为800天.( )",{"answer":74,"createTime":5,"id":75,"options":76,"question":81,"source":25,"type":53},[],1118927620,[77,78,79,80],"86000㎡","134000㎡","80000㎡","100000㎡","宜昌市伍家岗区共勤村安置房建设项目工程总建筑面积为( )",{"answer":83,"createTime":5,"id":84,"options":85,"question":90,"source":25,"type":30},[],1118927626,[86,87,88,89],"场地处理","临设布置","设备布置","构件生产验收","现场准备主要任务包括( )"]