[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fKSWAWaAXtg8MBfyDIfeoUlZ5x9KHUANV8Q4gUum_8KE":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":11,"question":15,"related":16,"source":24,"type":53},[],"2026-05-19 16:53:05",1118927610,[8,9,10,8],"5MPa","8MPa","10MPa",{"courseId":12,"workId":13,"workName":14},"1000084130","66986037","第五章单元测试","吊装上一层结构构件前,当混凝土强度无设计要求时,其最低强度应不小于( )",[17,26,36,41,50,54,63,68,73,82],{"answer":18,"createTime":5,"id":19,"options":20,"question":23,"source":24,"type":25},[],1118927602,[21,22],"对","错","构件吊运过程中,构件下方可以短暂停留人员.( )","v2",3,{"answer":27,"createTime":5,"id":28,"options":29,"question":34,"source":24,"type":35},[],1118927605,[30,31,32,33],"套筒灌浆流动度","灌浆压力","灌浆饱满度","后浇混凝土蜂窝、麻面、裂缝原因","节点连接关键技术分析内容包括( )",1,{"answer":37,"createTime":5,"id":38,"options":39,"question":40,"source":24,"type":25},[],1118927607,[21,22],"后浇混凝土浇筑后不需要养护.( )",{"answer":42,"createTime":5,"id":43,"options":44,"question":49,"source":24,"type":35},[],1118927608,[45,46,47,48],"高空作业风险","构件坠落风险","构件变形风险","构件错位风险","水平构件吊装安全风险包括( )",{"answer":51,"createTime":5,"id":6,"options":52,"question":15,"source":24,"type":53},[],[8,9,10,8],0,{"answer":55,"createTime":5,"id":56,"options":57,"question":62,"source":24,"type":53},[],1118927613,[58,59,60,61],"1mm","2mm","3mm","5mm","梁底支撑标高调整必须高出梁底结构标高( )",{"answer":64,"createTime":5,"id":65,"options":66,"question":67,"source":24,"type":25},[],1118927616,[21,22],"梁底支撑间距可大于 1.5 m,只要支撑牢固即可.( )",{"answer":69,"createTime":5,"id":70,"options":71,"question":72,"source":24,"type":25},[],1118927619,[21,22],"宜昌市伍家岗区共勤村安置房建设项目工程工期总日历天数为800天.( )",{"answer":74,"createTime":5,"id":75,"options":76,"question":81,"source":24,"type":53},[],1118927620,[77,78,79,80],"86000㎡","134000㎡","80000㎡","100000㎡","宜昌市伍家岗区共勤村安置房建设项目工程总建筑面积为( )",{"answer":83,"createTime":5,"id":84,"options":85,"question":90,"source":24,"type":35},[],1118927626,[86,87,88,89],"场地处理","临设布置","设备布置","构件生产验收","现场准备主要任务包括( )"]