[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fNJyPZNaFTqAYVZwsF9RJIXTt3j2ykZ0bZIy0XzoD_jI":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":10,"question":14,"related":15,"source":21,"type":22},[],"2026-05-19 16:53:05",1118927619,[8,9],"对","错",{"courseId":11,"workId":12,"workName":13},"1000084130","66986037","第五章单元测试","宜昌市伍家岗区共勤村安置房建设项目工程工期总日历天数为800天.( )",[16,23,33,38,47,56,65,70,73,82],{"answer":17,"createTime":5,"id":18,"options":19,"question":20,"source":21,"type":22},[],1118927602,[8,9],"构件吊运过程中,构件下方可以短暂停留人员.( )","v2",3,{"answer":24,"createTime":5,"id":25,"options":26,"question":31,"source":21,"type":32},[],1118927605,[27,28,29,30],"套筒灌浆流动度","灌浆压力","灌浆饱满度","后浇混凝土蜂窝、麻面、裂缝原因","节点连接关键技术分析内容包括( )",1,{"answer":34,"createTime":5,"id":35,"options":36,"question":37,"source":21,"type":22},[],1118927607,[8,9],"后浇混凝土浇筑后不需要养护.( )",{"answer":39,"createTime":5,"id":40,"options":41,"question":46,"source":21,"type":32},[],1118927608,[42,43,44,45],"高空作业风险","构件坠落风险","构件变形风险","构件错位风险","水平构件吊装安全风险包括( )",{"answer":48,"createTime":5,"id":49,"options":50,"question":54,"source":21,"type":55},[],1118927610,[51,52,53,51],"5MPa","8MPa","10MPa","吊装上一层结构构件前,当混凝土强度无设计要求时,其最低强度应不小于( )",0,{"answer":57,"createTime":5,"id":58,"options":59,"question":64,"source":21,"type":55},[],1118927613,[60,61,62,63],"1mm","2mm","3mm","5mm","梁底支撑标高调整必须高出梁底结构标高( )",{"answer":66,"createTime":5,"id":67,"options":68,"question":69,"source":21,"type":22},[],1118927616,[8,9],"梁底支撑间距可大于 1.5 m,只要支撑牢固即可.( )",{"answer":71,"createTime":5,"id":6,"options":72,"question":14,"source":21,"type":22},[],[8,9],{"answer":74,"createTime":5,"id":75,"options":76,"question":81,"source":21,"type":55},[],1118927620,[77,78,79,80],"86000㎡","134000㎡","80000㎡","100000㎡","宜昌市伍家岗区共勤村安置房建设项目工程总建筑面积为( )",{"answer":83,"createTime":5,"id":84,"options":85,"question":90,"source":21,"type":32},[],1118927626,[86,87,88,89],"场地处理","临设布置","设备布置","构件生产验收","现场准备主要任务包括( )"]