[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fnIxRBmwSoI-eaXFoxpZbmTMp_VtVH_vxLNl-YazrooM":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":16,"related":17,"source":25,"type":59},[],"2026-05-19 16:53:05",1118927620,[8,9,10,11],"86000㎡","134000㎡","80000㎡","100000㎡",{"courseId":13,"workId":14,"workName":15},"1000084130","66986037","第五章单元测试","宜昌市伍家岗区共勤村安置房建设项目工程总建筑面积为( )",[18,27,37,42,51,60,69,74,79,82],{"answer":19,"createTime":5,"id":20,"options":21,"question":24,"source":25,"type":26},[],1118927602,[22,23],"对","错","构件吊运过程中,构件下方可以短暂停留人员.( )","v2",3,{"answer":28,"createTime":5,"id":29,"options":30,"question":35,"source":25,"type":36},[],1118927605,[31,32,33,34],"套筒灌浆流动度","灌浆压力","灌浆饱满度","后浇混凝土蜂窝、麻面、裂缝原因","节点连接关键技术分析内容包括( )",1,{"answer":38,"createTime":5,"id":39,"options":40,"question":41,"source":25,"type":26},[],1118927607,[22,23],"后浇混凝土浇筑后不需要养护.( )",{"answer":43,"createTime":5,"id":44,"options":45,"question":50,"source":25,"type":36},[],1118927608,[46,47,48,49],"高空作业风险","构件坠落风险","构件变形风险","构件错位风险","水平构件吊装安全风险包括( )",{"answer":52,"createTime":5,"id":53,"options":54,"question":58,"source":25,"type":59},[],1118927610,[55,56,57,55],"5MPa","8MPa","10MPa","吊装上一层结构构件前,当混凝土强度无设计要求时,其最低强度应不小于( )",0,{"answer":61,"createTime":5,"id":62,"options":63,"question":68,"source":25,"type":59},[],1118927613,[64,65,66,67],"1mm","2mm","3mm","5mm","梁底支撑标高调整必须高出梁底结构标高( )",{"answer":70,"createTime":5,"id":71,"options":72,"question":73,"source":25,"type":26},[],1118927616,[22,23],"梁底支撑间距可大于 1.5 m,只要支撑牢固即可.( )",{"answer":75,"createTime":5,"id":76,"options":77,"question":78,"source":25,"type":26},[],1118927619,[22,23],"宜昌市伍家岗区共勤村安置房建设项目工程工期总日历天数为800天.( )",{"answer":80,"createTime":5,"id":6,"options":81,"question":16,"source":25,"type":59},[],[8,9,10,11],{"answer":83,"createTime":5,"id":84,"options":85,"question":90,"source":25,"type":36},[],1118927626,[86,87,88,89],"场地处理","临设布置","设备布置","构件生产验收","现场准备主要任务包括( )"]