[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fAiiBVEAEGHj54oN80KZ9uLDSaLrMRLs9Fck1IelgfAs":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":13,"question":17,"related":18,"source":26,"type":37},[],"2026-05-19 16:53:05",1118927659,[8,9,10,11,12],"施工前需由木工根据设计图纸翻样并绘制叠合阳台板加工图","叠合阳台板运送至施工现场后,由塔吊吊运至楼层进行铺放","阳台板吊放前无需搭设排架,对位后采用临时支撑固定","阳台板钢筋需插入主体结构180 mm,部分钢筋根据设计要求需要进行焊接","阳台板安装固定后,应按结构层施工工序继续进行后续施工",{"courseId":14,"workId":15,"workName":16},"1000084130","66986037","第五章单元测试","关于叠合阳台板的施工方法,下列说法正确的有( )",[19,28,38,43,52,61,70,75,80,89],{"answer":20,"createTime":5,"id":21,"options":22,"question":25,"source":26,"type":27},[],1118927602,[23,24],"对","错","构件吊运过程中,构件下方可以短暂停留人员.( )","v2",3,{"answer":29,"createTime":5,"id":30,"options":31,"question":36,"source":26,"type":37},[],1118927605,[32,33,34,35],"套筒灌浆流动度","灌浆压力","灌浆饱满度","后浇混凝土蜂窝、麻面、裂缝原因","节点连接关键技术分析内容包括( )",1,{"answer":39,"createTime":5,"id":40,"options":41,"question":42,"source":26,"type":27},[],1118927607,[23,24],"后浇混凝土浇筑后不需要养护.( )",{"answer":44,"createTime":5,"id":45,"options":46,"question":51,"source":26,"type":37},[],1118927608,[47,48,49,50],"高空作业风险","构件坠落风险","构件变形风险","构件错位风险","水平构件吊装安全风险包括( )",{"answer":53,"createTime":5,"id":54,"options":55,"question":59,"source":26,"type":60},[],1118927610,[56,57,58,56],"5MPa","8MPa","10MPa","吊装上一层结构构件前,当混凝土强度无设计要求时,其最低强度应不小于( )",0,{"answer":62,"createTime":5,"id":63,"options":64,"question":69,"source":26,"type":60},[],1118927613,[65,66,67,68],"1mm","2mm","3mm","5mm","梁底支撑标高调整必须高出梁底结构标高( )",{"answer":71,"createTime":5,"id":72,"options":73,"question":74,"source":26,"type":27},[],1118927616,[23,24],"梁底支撑间距可大于 1.5 m,只要支撑牢固即可.( )",{"answer":76,"createTime":5,"id":77,"options":78,"question":79,"source":26,"type":27},[],1118927619,[23,24],"宜昌市伍家岗区共勤村安置房建设项目工程工期总日历天数为800天.( )",{"answer":81,"createTime":5,"id":82,"options":83,"question":88,"source":26,"type":60},[],1118927620,[84,85,86,87],"86000㎡","134000㎡","80000㎡","100000㎡","宜昌市伍家岗区共勤村安置房建设项目工程总建筑面积为( )",{"answer":90,"createTime":5,"id":91,"options":92,"question":97,"source":26,"type":37},[],1118927626,[93,94,95,96],"场地处理","临设布置","设备布置","构件生产验收","现场准备主要任务包括( )"]