[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fQNlxppwdtmj2JHksjH5t-Up50wJO_NmHVw85DU67G70":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":13,"question":17,"related":18,"source":22,"type":23},[],"2026-05-19 16:42:57",1118927688,[8,9,10,11,12],"灌浆操作人员须具备合格的体检情况","施工中更换灌浆套筒或灌浆料需提交书面说明","内容包括套筒预制定位、构件安装定位与支撑、灌浆料拌和、灌浆施工及检查修补等","施工方案应依据接头供应单位提供的技术资料和操作规程编制","灌浆料须具备合格证",{"courseId":14,"workId":15,"workName":16},"1000084130","66986035","第三章单元测试","钢筋套筒灌浆施工方案包括( )",[19,24,32,42,52],{"answer":20,"createTime":5,"id":6,"options":21,"question":17,"source":22,"type":23},[],[8,9,10,11,12],"v2",1,{"answer":25,"createTime":5,"id":26,"options":27,"question":30,"source":22,"type":31},[],1118927742,[28,29],"对","错","装配式结构专项方案主要包括但不限于下列内容:整体进度计划、预制构件运输、施工场地布置、构件安装、施工安全、质量管理、绿色环保.( )",3,{"answer":33,"createTime":5,"id":34,"options":35,"question":40,"source":22,"type":41},[],1118927745,[36,37,38,39],"①②③④","①④③②","①②④③","①③④②","预制梁支撑安装流程( )①梁吊装就位 ②梁灌浆套筒灌浆 ③梁钢筋连接 ④调节梁水平与垂直度",0,{"answer":43,"createTime":5,"id":44,"options":45,"question":51,"source":22,"type":23},[],1118927747,[46,47,48,49,50],"按照工程特性(沉降缝或单元)划分流水段","PC构件吊装数量及现浇结构混凝土施工量","按照流水段组织模板、钢筋、混凝土、吊装等工种","施工现场办公区布置","施工机械租赁合同签订","在进行装配式建筑施工流水段划分时,应考虑的主要内容包括( )",{"answer":53,"createTime":5,"id":54,"options":55,"question":56,"source":22,"type":31},[],1118927751,[28,29],"装配式混凝土框架结构工法特点:预制构件如梁、柱、楼梯、叠合板和外挂墙板可工业化生产,施工安装便捷.( )"]