[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fmH4oQkmU_hBBw-D2r0iIiW1Fl-uzxon8rGSHDQQqHR4":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":13,"question":17,"related":18,"source":28,"type":49},[],"2026-05-19 16:46:53",1118927708,[8,9,10,11,12],"节点模板安装前,在模板支设处楼面及模板与结构面结合处粘贴30mm宽双面胶带","模板用M12对拉螺栓紧固,螺栓外套直径20塑料管,两端与模板接触处加塑料帽,外加海绵止水垫","对拉螺栓间距不宜大于800mm","上端对拉螺栓距模板上口不宜大于400mm,下端距模板下口不宜大于200mm","上端对拉螺栓距模板上口不宜大于5400mm,下端距模板下口不宜大于300mm",{"courseId":14,"workId":15,"workName":16},"1000084130","66986036","第四章单元测试","连接节点模板安装要求( )",[19,30,39,50,59,67,70,75],{"answer":20,"createTime":5,"id":21,"options":22,"question":27,"source":28,"type":29},[],1118927635,[23,24,25,26],"1\u002F2","1\u002F4","1\u002F3","1\u002F5","垫片找平.预制墙板下口与楼板间设计有20mm缝隙(灌浆用),吊装预制件前,在所有构件框架线内取构件总长度( )的两点铁垫片作为找平位置","v2",0,{"answer":31,"createTime":5,"id":32,"options":33,"question":38,"source":28,"type":29},[],1118927647,[34,35,36,37],"2cm","3cm","2.5cm","3.5 cm","垫片找平.预制墙板下口与楼板间垫起总厚度为( )",{"answer":40,"createTime":5,"id":41,"options":42,"question":48,"source":28,"type":49},[],1118927697,[43,44,45,46,47],"水平构件就位后应立即安装临时支撑,并依据标高控制线调节支撑高度,控制构件标高","临时支撑距水平构件支座处不应大于600mm","临时支撑沿构件长度方向的间距应小于2000mm","跨度大于4000mm的叠合板中部应加设临时支撑起拱,起拱高度不大于板跨的3%","叠合板临时支撑应沿受力方向布置在板边,支撑上部垫板应位于两块叠合板板缝中间","水平构件临时支撑安装要求( )",1,{"answer":51,"createTime":5,"id":52,"options":53,"question":58,"source":28,"type":29},[],1118927703,[54,55,56,57],"主控线校正无误后,应测量剪力墙、柱轴线、构件边线、暗柱位置线、洞口边线及200 mm控制线","在竖向预制构件下部500 mm处弹出标高线即可满足全部标高控制要求","定位放线主要依赖激光仪扫描柱的垂直度完成","放线过程中可不进行轴线引测,只需控制构件边线即可","关于装配式建筑施工定位放线要求,下列说法正确的是( )",{"answer":60,"createTime":5,"id":61,"options":62,"question":65,"source":28,"type":66},[],1118927706,[63,64],"对","错","浆锚节点灌浆应密实,灌浆料28 d抗压强度不应低于50 MPa.( )",3,{"answer":68,"createTime":5,"id":6,"options":69,"question":17,"source":28,"type":49},[],[8,9,10,11,12],{"answer":71,"createTime":5,"id":72,"options":73,"question":74,"source":28,"type":66},[],1118927711,[63,64],"室内楼梯踏步、墙面阴角应粘贴10 mm宽铝角条保护.( )",{"answer":76,"createTime":5,"id":77,"options":78,"question":79,"source":28,"type":66},[],1118927713,[63,64],"预制构件运输时,构件间应釆用垫木架空,上、下垫木应在同一垂直线上,以确保构件棱角不被破坏.( )"]