[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fo3E1Rme3tGxlVI1Ts9nc7_iTQLVUXSawVN3IQupIMRg":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":10,"question":14,"related":15,"source":25,"type":61},[],"2026-05-19 16:46:53",1118927711,[8,9],"对","错",{"courseId":11,"workId":12,"workName":13},"1000084130","66986036","第四章单元测试","室内楼梯踏步、墙面阴角应粘贴10 mm宽铝角条保护.( )",[16,27,36,47,56,62,72,75],{"answer":17,"createTime":5,"id":18,"options":19,"question":24,"source":25,"type":26},[],1118927635,[20,21,22,23],"1\u002F2","1\u002F4","1\u002F3","1\u002F5","垫片找平.预制墙板下口与楼板间设计有20mm缝隙(灌浆用),吊装预制件前,在所有构件框架线内取构件总长度( )的两点铁垫片作为找平位置","v2",0,{"answer":28,"createTime":5,"id":29,"options":30,"question":35,"source":25,"type":26},[],1118927647,[31,32,33,34],"2cm","3cm","2.5cm","3.5 cm","垫片找平.预制墙板下口与楼板间垫起总厚度为( )",{"answer":37,"createTime":5,"id":38,"options":39,"question":45,"source":25,"type":46},[],1118927697,[40,41,42,43,44],"水平构件就位后应立即安装临时支撑,并依据标高控制线调节支撑高度,控制构件标高","临时支撑距水平构件支座处不应大于600mm","临时支撑沿构件长度方向的间距应小于2000mm","跨度大于4000mm的叠合板中部应加设临时支撑起拱,起拱高度不大于板跨的3%","叠合板临时支撑应沿受力方向布置在板边,支撑上部垫板应位于两块叠合板板缝中间","水平构件临时支撑安装要求( )",1,{"answer":48,"createTime":5,"id":49,"options":50,"question":55,"source":25,"type":26},[],1118927703,[51,52,53,54],"主控线校正无误后,应测量剪力墙、柱轴线、构件边线、暗柱位置线、洞口边线及200 mm控制线","在竖向预制构件下部500 mm处弹出标高线即可满足全部标高控制要求","定位放线主要依赖激光仪扫描柱的垂直度完成","放线过程中可不进行轴线引测,只需控制构件边线即可","关于装配式建筑施工定位放线要求,下列说法正确的是( )",{"answer":57,"createTime":5,"id":58,"options":59,"question":60,"source":25,"type":61},[],1118927706,[8,9],"浆锚节点灌浆应密实,灌浆料28 d抗压强度不应低于50 MPa.( )",3,{"answer":63,"createTime":5,"id":64,"options":65,"question":71,"source":25,"type":46},[],1118927708,[66,67,68,69,70],"节点模板安装前,在模板支设处楼面及模板与结构面结合处粘贴30mm宽双面胶带","模板用M12对拉螺栓紧固,螺栓外套直径20塑料管,两端与模板接触处加塑料帽,外加海绵止水垫","对拉螺栓间距不宜大于800mm","上端对拉螺栓距模板上口不宜大于400mm,下端距模板下口不宜大于200mm","上端对拉螺栓距模板上口不宜大于5400mm,下端距模板下口不宜大于300mm","连接节点模板安装要求( )",{"answer":73,"createTime":5,"id":6,"options":74,"question":14,"source":25,"type":61},[],[8,9],{"answer":76,"createTime":5,"id":77,"options":78,"question":79,"source":25,"type":61},[],1118927713,[8,9],"预制构件运输时,构件间应釆用垫木架空,上、下垫木应在同一垂直线上,以确保构件棱角不被破坏.( )"]