[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fZWvM-ISmbn1bC_2vZMBFg7AalzMkQ43YDfGRZIfYV1U":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":10,"question":14,"related":15,"source":25,"type":39},[],"2026-05-19 17:01:27",1118928096,[8,9],"对","错",{"courseId":11,"workId":12,"workName":13},"1000084130","66986031","第六章单元测试","宜昌市伍家岗区共勤村安置房建设项目工程工期总日历天数为800天.( )",[16,27,36,40,50,59,68,73],{"answer":17,"createTime":5,"id":18,"options":19,"question":24,"source":25,"type":26},[],1118928091,[20,21,22,23],"套筒灌浆流动度","灌浆压力","灌浆饱满度","后浇混凝土蜂窝、麻面、裂缝原因","节点连接关键技术分析内容包括( )","v2",1,{"answer":28,"createTime":5,"id":29,"options":30,"question":35,"source":25,"type":26},[],1118928093,[31,32,33,34],"高空作业风险","构件坠落风险","构件变形风险","构件错位风险","水平构件吊装安全风险包括( )",{"answer":37,"createTime":5,"id":6,"options":38,"question":14,"source":25,"type":39},[],[8,9],3,{"answer":41,"createTime":5,"id":42,"options":43,"question":48,"source":25,"type":49},[],1118928098,[44,45,46,47],"86000㎡","134000㎡","80000㎡","100000㎡","宜昌市伍家岗区共勤村安置房建设项目工程总建筑面积为( )",0,{"answer":51,"createTime":5,"id":52,"options":53,"question":58,"source":25,"type":26},[],1118928102,[54,55,56,57],"场地处理","临设布置","设备布置","构件生产验收","现场准备主要任务包括( )",{"answer":60,"createTime":5,"id":61,"options":62,"question":67,"source":25,"type":49},[],1118928105,[63,64,65,66],"6小时","12小时","24小时","48小时","灌浆后多少小时内不得扰动构件?( )",{"answer":69,"createTime":5,"id":70,"options":71,"question":72,"source":25,"type":39},[],1118928107,[8,9],"后浇混凝土浇筑后不需要养护.( )",{"answer":74,"createTime":5,"id":75,"options":76,"question":77,"source":25,"type":39},[],1118928109,[8,9],"构件吊运过程中,构件下方可以短暂停留人员.( )"]