[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$f0Wk1CZEIzP51wZmHfi8DMO0jWkga7taZDJ_V7Fnf_SY":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":16,"related":17,"source":27,"type":55},[],"2026-05-19 17:01:27",1118928105,[8,9,10,11],"6小时","12小时","24小时","48小时",{"courseId":13,"workId":14,"workName":15},"1000084130","66986031","第六章单元测试","灌浆后多少小时内不得扰动构件?( )",[18,29,38,46,56,65,68,73],{"answer":19,"createTime":5,"id":20,"options":21,"question":26,"source":27,"type":28},[],1118928091,[22,23,24,25],"套筒灌浆流动度","灌浆压力","灌浆饱满度","后浇混凝土蜂窝、麻面、裂缝原因","节点连接关键技术分析内容包括( )","v2",1,{"answer":30,"createTime":5,"id":31,"options":32,"question":37,"source":27,"type":28},[],1118928093,[33,34,35,36],"高空作业风险","构件坠落风险","构件变形风险","构件错位风险","水平构件吊装安全风险包括( )",{"answer":39,"createTime":5,"id":40,"options":41,"question":44,"source":27,"type":45},[],1118928096,[42,43],"对","错","宜昌市伍家岗区共勤村安置房建设项目工程工期总日历天数为800天.( )",3,{"answer":47,"createTime":5,"id":48,"options":49,"question":54,"source":27,"type":55},[],1118928098,[50,51,52,53],"86000㎡","134000㎡","80000㎡","100000㎡","宜昌市伍家岗区共勤村安置房建设项目工程总建筑面积为( )",0,{"answer":57,"createTime":5,"id":58,"options":59,"question":64,"source":27,"type":28},[],1118928102,[60,61,62,63],"场地处理","临设布置","设备布置","构件生产验收","现场准备主要任务包括( )",{"answer":66,"createTime":5,"id":6,"options":67,"question":16,"source":27,"type":55},[],[8,9,10,11],{"answer":69,"createTime":5,"id":70,"options":71,"question":72,"source":27,"type":45},[],1118928107,[42,43],"后浇混凝土浇筑后不需要养护.( )",{"answer":74,"createTime":5,"id":75,"options":76,"question":77,"source":27,"type":45},[],1118928109,[42,43],"构件吊运过程中,构件下方可以短暂停留人员.( )"]