[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$flE1UfpKldp3xaDDYJIeRgNh7IzX-ZTSEgkk7jegNBAE":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":18,"related":19,"source":29,"type":40},[],"2023-05-08 19:57:23",15947231,[8,9,10,11],"Reschedule the start date of the project based on the availability of a grade 7","Ask the sponsor for a higher priority for your project","Reduce the scope of the project","See if the grade 9 can do the job in less time",{"courseId":13,"courseImg":14,"courseName":15,"workId":16,"workName":17},"1000011085","https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F842f5c7a3ba8ddcf99156002bfcfcc39.png","Project Management","8750304","Project Management教程考试","You priced out a project at 1,000 hours assuming a grade 7 employee would be assigned. The functional manager assigns a grade 9 employee. This will result in a great cost overrun. The project manager should ( )",[20,31,41,50,59,67,70,79,84,89],{"answer":21,"createTime":5,"id":22,"options":23,"question":28,"source":29,"type":30},[],15947107,[24,25,26,27],"PDCA cycle","Cause-and-effect diagram","Histograms","Six sigma","Which of the following are the most common tools for quality improvement? ( )","v2",1,{"answer":32,"createTime":5,"id":33,"options":34,"question":39,"source":29,"type":40},[],15947171,[35,36,37,38],"Traditional","Projectized","Strong Matrix","Weak Matrix","In which organizational structure is it most difficult to integrate project activities?( )",0,{"answer":42,"createTime":5,"id":43,"options":44,"question":49,"source":29,"type":30},[],15947177,[45,46,47,48],"Risk analysis","Risk avoidance","Risk Mitigation","Risk Transfer","Which of the following are the strategies of project risk response? ( )",{"answer":51,"createTime":5,"id":52,"options":53,"question":58,"source":29,"type":30},[],15947190,[54,55,56,57],"Build a logic tree, usually from right to left, including all decision points and chance points","Put the probabilities of the states of nature on the branches to form a probability tree","Analyze the internal relations between all the branches","Add the conditional payoffs, thus completing the decision tree","Which of the following are steps to construct a decision tree diagram? ( )",{"answer":60,"createTime":5,"id":61,"options":62,"question":65,"source":29,"type":66},[],15947226,[63,64],"对","错","Project manager is the determinant to achieve the project objective. ( )",3,{"answer":68,"createTime":5,"id":6,"options":69,"question":18,"source":29,"type":40},[],[8,9,10,11],{"answer":71,"createTime":5,"id":72,"options":73,"question":78,"source":29,"type":40},[],15947244,[74,75,76,77],"On-the-job training","University seminars","Professional seminars and meeting","Graduate degrees in project management","Most people believe that the best way to train someone in project management is through ( )",{"answer":80,"createTime":5,"id":81,"options":82,"question":83,"source":29,"type":66},[],15947261,[63,64],"Project management is both science and art.( )",{"answer":85,"createTime":5,"id":86,"options":87,"question":88,"source":29,"type":66},[],15947292,[63,64],"Proper scope planning is critical to project success. ( )",{"answer":90,"createTime":5,"id":91,"options":92,"question":97,"source":29,"type":40},[],15947333,[93,94,95,96],"Activity duration length","Critical path","Maximum slack path","Compression path","The shortest time necessary to complete all of the activities in a network is called ( )"]