[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fAie41KdMAJNRk9gpsKQnMaWo6UJhKwShcseFcpxwK0g":3},{"id":4,"source":5,"question":6,"options":7,"answer":12,"related":13,"type":24,"origin":111,"createTime":26},899081334,"v2","根据《施工合同示范文本》中的通用合同条款,工程接收证书颁发后,承包人按监理人指示完成施工场地内残留垃圾清除工作的费用应由( )承担",[8,9,10,11],"发包人","监理人","发包人和承包人共同","承包人",[],[14,27,37,47,57,67,77,87,97,101],{"id":15,"source":5,"question":16,"options":17,"answer":22,"related":23,"type":24,"origin":25,"createTime":26},899081313,"某施工企业向某建筑材料供应商发出购买建筑材料的要约,该建筑材料供应商在承诺有效期内对该要约作出了完全同意的答复,则该合同成立的时间为( )",[18,19,20,21],"建筑材料供应商的答复文件到达施工企业时","施工企业发出订购建筑材料的要约时","建筑材料供应商发出答复文件时","施工企业订购建筑材料的要约到达建筑材料供应商时",[],[],0,null,"2023-05-08T15:05:57+08:00",{"id":28,"source":5,"question":29,"options":30,"answer":35,"related":36,"type":24,"origin":25,"createTime":26},899081314,"建设项目完工后,施工企业已提交竣工验收报告,如建设单位未组织竣工验收,当事人对建设工程实际竣工日期有争议的,该项目的竣工日期( )",[31,32,33,34],"相应顺延","以施工企业提交竣工验收报告之日为准","以合同约定的计划竣工日期为准","以实际通过竣工验收之日为准",[],[],{"id":38,"source":5,"question":39,"options":40,"answer":45,"related":46,"type":24,"origin":25,"createTime":26},899081318,"在投标文件的报价单中,如果出现总价金额和分项单价与工程量乘积之和的金额不一致时,应当( )",[41,42,43,44],"以总价金额为准,由评标委员会直接修正即可","以总价金额为准,由评标委员会修正后请该标书的投标授权人予以签字确认","以分项单价与工程量乘积之和为准,由评标委员会直接修正即可","以分项单价与工程量乘积之和为准,由评标委员会修正后让该标书的投标授权人予以签字确认",[],[],{"id":48,"source":5,"question":49,"options":50,"answer":55,"related":56,"type":24,"origin":25,"createTime":26},899081323,"在招标投标中,关于履约保证金的说法,正确的是( )",[51,52,53,54],"招标文件中不得要求中标人提交履约保证金","履约保证金是为了保证中标人按照合同约定履行义务完成中标项目而设立的","履约保证金的金额没有法律规定的限制,招标人可要求中标人提交任意金额的履约保证金","不鼓励施工企业以银行保函形式向建设单位提供履约担保",[],[],{"id":58,"source":5,"question":59,"options":60,"answer":65,"related":66,"type":24,"origin":25,"createTime":26},899081325,"分包工程总承包发生质量问题时,关于总分包质量责任的说法,正确的是( )",[61,62,63,64],"建设单位必须先向总承包单位请求赔偿,不足部分再向分包单位请求赔偿","建设单位应当在分包合同价款限额内向分包单位求偿","其他受害人可以向分包单位请求赔偿,也可以向总承包单位请求赔偿","其他受害人必须先向分包单位请求赔偿,不足部分再向总承包单位请求赔偿",[],[],{"id":68,"source":5,"question":69,"options":70,"answer":75,"related":76,"type":24,"origin":25,"createTime":26},899081328,"对于技术复杂、专业性强的招标项目,从专家库中随机抽取的评标专家难以保证胜任评标工作的,可以由( )直接确定评标专家",[71,72,73,74],"招投标监督机构","上级主管部门","招标代理机构","招标人",[],[],{"id":78,"source":5,"question":79,"options":80,"answer":85,"related":86,"type":24,"origin":25,"createTime":26},899081331,"根据《施工合同示范文本》中的通用合同条款,属于发包人义务的是( )",[81,82,83,84],"组织设计交底","编制施工环保措施计划","审批施工组织设计","组织论证专项施工方案",[],[],{"id":88,"source":5,"question":89,"options":90,"answer":95,"related":96,"type":24,"origin":25,"createTime":26},899081333,"根据《施工合同示范文本》中的通用合同条款,价格调整公式中的定值权重为0.2时,可调因子的变值权重之和为( )",[91,92,93,94],"0.8","1.0","1.2","1.8",[],[],{"id":4,"source":5,"question":6,"options":98,"answer":99,"related":100,"type":24,"origin":25,"createTime":26},[8,9,10,11],[],[],{"id":102,"source":5,"question":103,"options":104,"answer":109,"related":110,"type":24,"origin":25,"createTime":26},899081335,"根据《施工合同示范文本》中的通用合同条款,监理人收到承包人提交进度付款申请单后的处理程序为( )",[105,106,107,108],"监理人核查-发包人确认-发包人出具经监理人签认的进度付款证书","监理人核查-发包人审查同意-监理人出具经发包人签认的进度付款证书","监理人核查-发包人审查同意-监理人出具经承包人签认的进度付款证书","监理人核查-承包人签认-发包人出具进度付款证书",[],[],{"courseName":112,"courseImg":112,"workName":113,"workId":114,"count":24,"courseId":115},"","工程招投标及合同管理教程考试","41700550","1000051078"]